Skip to main content

Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal

Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
October 2, 2018 Read time: 4 mins
Photo courtesy of Windsor-Detroit Bridge Authority and Bridging North America group
Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer


A partnership including 6343 Fluor Canada and 917 ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan.

The bridge is named after the Canadian ice hockey player Gordie Howe who was with the Detroit team Red Wings in North America’s National Hockey League for many years, leading them to several victories.

The six-lane bridge will also have dedicated pedestrian and cycling lanes. It will connect the two cities by linking Interstate 75 and Interstate 96 in

Michigan with the new extension of Highway 401 – also called the Herb Gray Parkway - in Ontario. Gray was a Windsor-born federal Canadian politician and deputy prime minister.

According to the WDBA, the bridge’s A-shaped towers will rival the height of Detroit’s 73-storey Renaissance Center.

The Canadian customs plaza will be the largest Canadian port of entry on the US-Canada border. The bridge will also be the longest cable-stayed bridge in North America, according to the companies.

Work will include building ports of entry on the US and Canadian sides of the river as well as improvements to existing infrastructure. Fluor and ACS will operate and maintain the facility for 30 years to standards set by WDBA under a public-private partnership (see box).

Terence Easton, president of Fluor’s infrastructure business, called the appointment a “once-in-a-generation project” and said financial close will likely be later this year.

The new bridge will be the second Windsor-Detroit crossing, joining the Ambassador Bridge, a suspension toll bridge owned by the US-based Moroun family. The 2.3km Ambassador, opened in 1929, is operated through the Detroit International Bridge Company in the US and the Canadian Transit Company in Canada.

The ageing Ambassador carries the vast majority of all vehicle freight between the two countries. But residents, businesses and local authorities struggle with long lines of backed up vehicles due to limited capacity on the four-lane bridge.

The new bridge will be a completely Canadian-owned  and operated structure. Michigan state was unsuccessful in lobbying by US state authorities for funding for what would have been a joint project. Canada decided to go ahead under a P3 deal, despite continuing objections from the Moroun family.

The new bridge, being Canadian, will not cost the US taxpayers anything. However, the Moroun family has sued the governments of Canada and Michigan state to stop construction of the Gordie Howe crossing and released a proposal to build their own second bridge, although few details have been released.

Fully behind the Gordie Howe Bridge is Michigan governor Rick Snyder who said, on the day of the WDA announcing the contractor, it will be “a towering symbol of the peace and prosperity shared by Michigan and Canada, our most vital trading partner”. It will also “create thousands of jobs in Michigan. It greatly enhances our supply chain and will create economic opportunities and growth in ways many people have not yet fully realised”.

The Canadian government estimates that toll revenue will be around $23 billion over the 30-year contract. Nonetheless, cost concerns for the new bridge are rising, as is the price tag.

Initial cost for the entire project was around US$1.5 billion but is now upwards of $3.7 billion. This has raised budget concerns in the past two years, with the latest in April, according to a report by the Canadian Broadcasting Corporation. The federal government ordered a review of the budget for a new cross-border bridge in Windsor, Ont., after concerns arose that the cost was in danger of exceeding spending targets, newly released documents show.

The Windsor-Detroit Bridge Authority is a not-for-profit Canadian government corporation created to manage the procurement process for the design, build, finance, operation and maintenance of the bridge through a public-private partnership (P3). WDBA is also responsible for project oversight.

Who’s who

Fluor Canada and ACS Infrastructure Canada led the development phase of the project and will hold the prime contract.

Other firms in Bridging North America include 4761 Dragados Canada, AECOM, brokerage services provider RBC Dominion Securities, Spanish engineering consultancy Carlos Fernandez Casado and FHECOR, architects Moriyama and Teshima and also architects Smith-Miller+Hawkinson.

Canadian construction firm Aecon was part of the group until it withdrew in May, reportedly because it was a potential takeover target by a Chinese state-owned company. The deal, however, was later blocked by the Canadian government.

This is the second project in the Windsor-Detroit area in which Fluor and ACS have partnered. They recently delivered, and are operating and maintaining the Herb Gray Parkway that will connect directly to the new bridge.

For more information on companies in this article

Related Content

  • SSL hits back over criticism of its work on the Champlain Bridge
    December 11, 2017
    The contactor building the replacement Champlain Bridge in Canada has hit back over of allegations of poor workmanship in the US$3.3 billion project. The new 3.4km cable-stayed Champlain Bridge over the St Lawrence River will have six lanes vehicle lanes and a separate cycle and pedestrian lane. Design life is 125 years and is being constructed under a public-private partnership and operating contract of 30 years after completion of construction. Work includes construction of a smaller bridge for Île des
  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
  • Fraser Crossing Partners chosen for new Pattullo Bridge in Canada
    February 25, 2020
    Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent