Skip to main content

Building Spain's highest viaduct

Amid a mountain wilderness, a new highway system rises, featuring Spain's highest viaduct For years, motorists and truck drivers in northern Spain have had to endure using a dangerous road liable to traffic hold-ups, delays and accidents, and frequently impassable in the depths of winter. In any event it is a slow and tortuous climb from Molledo on the Cantabrian lowlands up the N-611 road through the Cantabrian Mountains to Palencia, on the Meseta, Spain's high central plateau.
July 9, 2012 Read time: 4 mins
Transflex expansion joints from Trelleborg span the space between the decking and the abutments on viaducts, which form part of the A-67 highway in Spain. (Pic: Richard Surman/Trelleborg)

Amid a mountain wilderness, a new highway system rises, featuring Spain's highest viaduct

For years, motorists and truck drivers in northern Spain have had to endure using a dangerous road liable to traffic hold-ups, delays and accidents, and frequently impassable in the depths of winter.

In any event it is a slow and tortuous climb from Molledo on the Cantabrian lowlands up the N-611 road through the Cantabrian Mountains to Palencia, on the Meseta, Spain's high central plateau.

Now the N-611 is all but deserted, used mostly by local traffic, and in its place is the new Molledo-Pesquero section of the Autovia de la Meseta, a welcome addition to Spain's highway system.

When completed, the A-67 (the Autovia de la Meseta) will provide a high-speed link between Spain's capital Madrid in the centre of the country, and 4001 Santander, the capital of Cantabria, on the coast.

The highway is being designed and constructed by 2717 Ferrovial Agroman, a leading infrastructure company in Spain, and the first section, linking Molledo at 250m and Pesquero at 750m has been open for over a year.

The triumph of engineering and construction in a rugged and beautiful mountainous terrain, built to cope with high traffic volumes, extreme wind and temperatures, and sensitive environmental concerns, such as noise, visual impact and disturbance to the natural surroundings, posed two particular challenges for Ferrovial Agroman: the design and construction of the Montabliz and Pujayo viaducts.

The Montabliz viaduct was the greater challenge. At 805m long and 150m high, it spans an area of outstanding natural beauty in rough terrain. The Bisueña river runs underneath the viaduct, through a deep valley cloaked in ancient oak forest, and home to rare animals. In order to minimise disturbance to the valley floor and natural surroundings (and to minimise visual impact), the viaduct was constructed on four single tapering piers, supporting five deck spans. The central pier, at 140m high, is Spain's tallest, and the viaduct is the sixth highest in Europe.

Ferrovial Agroman used self-climbing formwork to construct the piers (a first in construction techniques in Spain), and the roadway is a continuous pre-stressed concrete deck, with the piers embedded in the concrete deck. The deck segments are the largest and heaviest built in Spain (constructed at the site) and among the largest in the world.

The viaduct at Pujayo, 420m long, also posed similar environmental challenges, and the same method of design and construction as that used at Montabliz also allowed for a reduction of road noise and the lowest possible visual impact on an adjacent village.
"Metal-style plate joints tend to be really noisy, and give an uncomfortable ride," says Juan Carlos Minaya, marketing and sales manager for engineered products in Izarra, Spain, part of Trelleborg Engineered Systems.

With a predicted average daily flow of some 11,500 vehicles, 16% of which comprises heavy freight trucks, any further noise reduction over that achieved by the basic structure design would be environmentally significant. At the initial stages of the project in 2005, Ferrovial Agroman approached Trelleborg, asking it to supply data on its Transflex high-movement seismic joints for bridges.

Trelleborg provided a 'mobile' section joining the abutments and the bridge decking. The surface design of the Transflex expansion joints plays a vital part in road noise reduction. These joints are the final piece in a series of measures designed to ensure bridge safety and to minimise environmental impact.

"The end result is an impressive section of high-grade mountain highway. Driving over the two viaducts, the driver is barely aware of passing over our expansion joints, while at the base of the piers, there is hardly any sound from traffic passing some 150m above," says Antonio Nogueira, who is head of production of the expansion joints division at Trelleborg in Izarra, Spain. "Mostly, you hear the wind rustling through the forest, and the occasional cry of the Iberian eagle."

Transflex expansion joints from Trelleborg span the space between the decking and the abutments on viaducts, which form part of the A-67 highway. They absorb movement caused by high traffic volumes, high winds and contraction, and expansion from temperature variations.

Juan Carlos Minaya explains: "Each expansion joint has two sections. The first is the bridging module, a strong rubber plate that spans the structural opening between the abutment and the bridge deck. The second is the movement module, which absorbs movements of the bridge deck. Horizontal safety anchor bars strengthen the entire unit and prevent sagging."

A form of surface patterning that creates very little noise as traffic passes over it has been developed. Transflex 3200 expansion joints are used on the Montablitz viaduct, 12 for each section, weighing 500kg each. On the shorter Pujayo viaduct, Transflex 1600 joints were used.

For more information on companies in this article

Related Content

  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Chile's challenging bridge and tunnel construction
    February 27, 2012
    SACYR Chile is constructing a bridge on the new Northeast Access Highway in the capital Santiago, and when complete the 22.5km route will link the suburbs of Vitacura and Colina to the city. Acceso Nororiente, opening this year, is the fifth urban freeway in Santiago and stands out because of the challenges in the construction of its bridges ands tunnels.
  • Agua Negra tunnel between Chile and Argentina
    May 15, 2014
    The current Paso de Agua Negra is the highest border crossing between Chile and Argentina. On the Argentine side, the Agua Negra Pass is located at 4,765m above sea level and 260km from the city of San Juan in the province of San Juan in the north-west of the country. On the Chilean side, the pass lies 229km from the city of La Serena in the Coquimbo region. The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for a total of 390km. From the C
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many