Skip to main content

Bridge inspection unit key to maintenance

A new bridge inspection unit is carrying out vital work in Vietnam.
February 29, 2012 Read time: 1 min
The Barin Bridge inspection unit is playing a key role in ensuring inspection and maintenance on Vietnam's Cuu Long (Can Tho) bridge, which measures some 2.75km long by 23.1m wide
A new bridge inspection unit is carrying out vital work in Vietnam.

Built by 1481 Barin in Italy, the AB16/S machine has been mounted on a 2394 Volvo FMII 6x2 chassis.

The inspection unit features a bucket type platform with a 300kg load, which can be used both under a bridge and for overhead work. It offers a 16m maximum underbridge reach and a maximum overhead reach of 18.7m.

Maximum vertical depth underbridge is 20m while the unit can overcome bridge barriers up to 4m high and clear pedestrian walkways 4.1m wide.

For more information on companies in this article

Related Content

  • New asphalt pavers deliver better surface quality
    February 13, 2012
    Progressive paving improvements are offering better surface quality
  • Asphalt paving review for 2019
    February 12, 2020
    A series of new asphalt pavers have been introduced in 2019
  • New small bridge inspection from Moog
    January 6, 2017
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.
  • New small bridge inspection from Moog
    April 17, 2013
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.