Skip to main content

Bridge inspection unit key to maintenance

A new bridge inspection unit is carrying out vital work in Vietnam.
February 29, 2012 Read time: 1 min
The Barin Bridge inspection unit is playing a key role in ensuring inspection and maintenance on Vietnam's Cuu Long (Can Tho) bridge, which measures some 2.75km long by 23.1m wide
A new bridge inspection unit is carrying out vital work in Vietnam.

Built by 1481 Barin in Italy, the AB16/S machine has been mounted on a 2394 Volvo FMII 6x2 chassis.

The inspection unit features a bucket type platform with a 300kg load, which can be used both under a bridge and for overhead work. It offers a 16m maximum underbridge reach and a maximum overhead reach of 18.7m.

Maximum vertical depth underbridge is 20m while the unit can overcome bridge barriers up to 4m high and clear pedestrian walkways 4.1m wide.

For more information on companies in this article

Related Content

  • Asphalt advances and industry innovations in paving
    May 20, 2014
    Asphalt paving technology continues to develop, benefiting from new technologies and new diesel engines - Mike Woof reports The asphalt paving equipment market is seeing the introduction of new low emission engines that will meet the Tier 4 Final regulations for Europe and North America. These have required some major engineering changes, with firms now having to install bulky exhaust after-treatment systems and additional cooling for engines and turbos.
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Concrete competition
    February 13, 2012
    The concrete paving market has provided stable ground for existing players, though key market developments are in hand. US manufacturers have long dominated the concrete paving sector with well-known firms such as GOMACO, Guntert & Zimmerman, Power Curbers, Power Pavers and Terex all being based in the US, while German firm Wirtgen is Europe's leading contender in this market. However there is some jostling for position in the concrete paving sector, with some of the players looking to enter new segments. T