Skip to main content

Bridge inspection unit key to maintenance

A new bridge inspection unit is carrying out vital work in Vietnam.
February 29, 2012 Read time: 1 min
The Barin Bridge inspection unit is playing a key role in ensuring inspection and maintenance on Vietnam's Cuu Long (Can Tho) bridge, which measures some 2.75km long by 23.1m wide
A new bridge inspection unit is carrying out vital work in Vietnam.

Built by 1481 Barin in Italy, the AB16/S machine has been mounted on a 2394 Volvo FMII 6x2 chassis.

The inspection unit features a bucket type platform with a 300kg load, which can be used both under a bridge and for overhead work. It offers a 16m maximum underbridge reach and a maximum overhead reach of 18.7m.

Maximum vertical depth underbridge is 20m while the unit can overcome bridge barriers up to 4m high and clear pedestrian walkways 4.1m wide.

For more information on companies in this article

Related Content

  • Volvo CE’s new L250H wheeled loader uses OptiShift to boost performance, safety and fuel economy
    January 6, 2017
    Volvo Construction Equipment’s new Tier 4 Final/Stage IV-compliant L250H wheeled loader has been designed to perform heavy tasks with better performance, safety and fuel economy levels using the manufacturer’s OptiShift technology. In North America the L250H is ideally suited to working with on-highway trucks, and the L250H will load a 22.7tonne tri-axle on-highway truck in just two passes. That’s two full buckets for one full truck says Volvo.
  • Volvo CE’s new L250H wheeled loader uses OptiShift to boost performance, safety and fuel economy
    March 7, 2014
    Volvo Construction Equipment’s new Tier 4 Final/Stage IV-compliant L250H wheeled loader has been designed to perform heavy tasks with better performance, safety and fuel economy levels using the manufacturer’s OptiShift technology. In North America the L250H is ideally suited to working with on-highway trucks, and the L250H will load a 22.7tonne tri-axle on-highway truck in just two passes. That’s two full buckets for one full truck says Volvo.
  • BarrierGuard 800 keeps key U.S. bridge open
    April 11, 2013
    BarrierGuard 800 from Highway Care is said to be preventing the closure of a vital highway bridge in the United States. As a critical part of the US national infrastructure, the Sarah Mildred Long Bridge services the Portsmouth Naval Shipyard. The link allows the transporting of spent nuclear fuel and heavy freight bound to and from the naval shipyard, with an average of 15,000 vehicles per day crossing this structurally deficient bridge. The railing along the Sarah Mildred Long Bridge had begun to deterio
  • New soil stabilising and recycling machines
    February 29, 2012
    Contractors now have a wider array of stabilisation tools to choose from, with several new units being announced at the Intermat exhibition in Paris.