Skip to main content

Bridge inspection unit key to maintenance

A new bridge inspection unit is carrying out vital work in Vietnam.
February 29, 2012 Read time: 1 min
The Barin Bridge inspection unit is playing a key role in ensuring inspection and maintenance on Vietnam's Cuu Long (Can Tho) bridge, which measures some 2.75km long by 23.1m wide
A new bridge inspection unit is carrying out vital work in Vietnam.

Built by 1481 Barin in Italy, the AB16/S machine has been mounted on a 2394 Volvo FMII 6x2 chassis.

The inspection unit features a bucket type platform with a 300kg load, which can be used both under a bridge and for overhead work. It offers a 16m maximum underbridge reach and a maximum overhead reach of 18.7m.

Maximum vertical depth underbridge is 20m while the unit can overcome bridge barriers up to 4m high and clear pedestrian walkways 4.1m wide.

For more information on companies in this article

Related Content

  • Concrete removal using high pressure water jets
    May 8, 2012
    The use of high-pressure water jets to remove old concrete on structures is becoming increasingly popular. Hydrodemolition of concrete structures by robotic equipment is becoming an increasingly used method for removing deteriorated concrete with high-pressure water techniques.
  • Crash cushion design
    February 13, 2012
    There are key differences in crash cushion design and quality for the United States and European markets. Developments in barrier technologies have followed the varying demands of specific markets, resulting in manufacturers offering different solutions for US and European needs.
  • Making a base
    July 20, 2012
    Soil stabilisation offers a cost effective solution for road construction in the right conditions Ensuring the soil underneath the aggregate base of a road has been stabilised with cement, lime or fly-ash can provide a greater working life and a reduced risk of problems that can arise as the road ages, such as subsidence. The technology works particularly well in ground with high clay content and where there are local shortages of stone for use in aggregates. Reducing the need for aggregates where they are
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.