Skip to main content

Assessing the risk of tunnels inn urban areas

A new technique for assessing the impacts of tunnels on nearby buildings and structures will allow a more realistic establishment of risk and could therefore reduce project insurance premiums
February 15, 2012 Read time: 2 mins

A new technique for assessing the impacts of tunnels on nearby buildings and structures will allow a more realistic establishment of risk and could therefore reduce project insurance premiums

Current ground movement predictions are based on empirical values and can over-estimate the potential damage to buildings, leading to unnecessary protection measures and therefore unnecessary cost for the client.

Dr Nagen Loganathan, tunnelling expert with 2693 Parsons Brinckerhoff, has designed a series of tools which can help designers assess risks to nearby buildings, structures and utilities.

And a new flow chart combines these tools to take designers through the steps needed to assess whether mitigation measures are needed for both piled and shallow foundations.

"In urban environments, tunnelling risks are particularly high because of their potential impacts on adjacent structures and utilities," said Loganathan who has published details of the new approach in his paper 'An Innovative Method for assessing Tunnelling Induced Risks to Adjacent Structures'.

"The monograph that I produced introduces a methodology to minimise those risks by identifying ground-loss and deformation mechanisms associated with tunnelling." Ground movements due to tunnelling are caused by groundloss as the tunnel boring machine (TBM) moves through the ground.

Loganathan has developed equations to calculate the groundloss due to the face of the TBM, the shield and the tail, and he has come up with formulae to show settlement at the surface, below the surface and lateral deformation.

Finally, a new set of tables predicts the impact of tunnelling on piles, showing how the piles will move as the TBM passes: pile head settlement; induced bending moment and axial down drag.

These tools could be particularly useful in the early stages of design when different routes and options are under consideration.

When a TBM face pressure is greater than the earth pressure at the face, the ground is pushed away from the TBM face, inducing heave at the surface. When the TBM has passed, a positive shield and tail loss occurs (closing of the physical gap), meaning the ground will move toward the tunnel, resulting in ground settlement.

For more information on companies in this article

Related Content

  • US DOTs in critical funding battle
    February 9, 2012
    In the US, state DOTs are preparing for the upcoming reauthorisation battle in a tough economic and political climate. Set to expire by the end of the year, the bill is a critical funding source for many transportation projects in the US. However transportation officials in the US are facing a tough battle as the political and economic climate has changed considerably since the last reauthorisation was passed, shortly after President Obama's inauguration in January 2009. Since then, the recession has contin
  • River level monitoring to reduce scour risk
    July 11, 2022
    An OTT ecoLog 1000 water level logger with cellular data connection to Hydromet Cloud was trialled upon the Vales Burn Bridge in Scotland
  • Machine visibility in focus from EU Commission
    November 9, 2015
    All round visibility from the operator’s seat of a construction machine is a topic in focus at the EU Commission. This has been a topic of concern for the construction machinery sector ever since the EU Commission released a warning relating to the standard. This standard has provisions covering visibility requirements for earth-moving machinery. A position paper is intended to help clarify the situation.
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin