Skip to main content

Arch of innovation

ULMA engineering solutions on the emblematic Arch of Innovation bridge, Brazil
September 21, 2020 Read time: 2 mins
With a height of 100m, it stands out also because of its distinctive arch shape

The Arch of Innovation is a cable-stayed bridge that will connect Zarur, São João, and Cassiano Ricardo avenues in São Paulo, Brazil. With a height of 100m, it has become one of the most iconic bridges in the country because of its distinctive arch shape.

This bridge will create a safer and faster route for more than 180,000 vehicles per day. It will also include a bicycle lane more than 3.6km long.

One of the most relevant requirements for this project has been the versatility of the formwork systems and the safety of those working on them. To this end, the engineering team developed an integrated solution with the ideal formwork and scaffolding systems and applications for the pylons and the roads that run between them.

The Queiroz Galvão construction company worked with ULMA's engineering solutions to meet the project’s stringent deadlines.

ULMA’s ATR self-climbing system was chosen for the two pylons with variable inclination and four-sided sections. It was erected in combination with the VMK timber-beam formwork for the outside and the KSP platform for the inside.

The self-climbing system was adapted to the inclination and elliptical curve of the shaft of up to 23º in the last concreting. The system has allowed high execution rates, three-day concreting cycles in 3.6m-high sections, without the need for a crane.

ULMA’s ATR self-climbing system was used for the two pylons
ULMA’s ATR self-climbing system was used for the two pylons

In addition, it has three levels of working platforms for carrying out work on the formwork, rebar and concrete, as well as for lifting the structure. This has maintained strict safety levels at great heights at all times. Despite the complexity of the geometry, the MK system in its different applications has completed all the structural requirements.

The two carriageways rest on an X shaped structure. They were built with ENKOFORM HMK, supported by T-60 shoring towers.

For construction of the bridge’s arch section, a structure made of MK and VM beams supported by T-60 shoring systems was set up. Custom metal profiles bear all the weight of the T-60 system.

To access the different areas of the bridge, BRIO stairs were completed on each side of the arch and in two separate sections. The first section is 60m high and rests on the ground. The second section, 40m high, consists of three independent staircases arranged on BMK consoles on the arch.

For more information on companies in this article

Related Content

  • ULMA's complete climbing solutions
    January 1, 2018
    ULMA's complete climbing solutions is an integral package that provides forming, climbing, and safety in a single product line. We offer an integrated solution that adapts to any height and geometry, is cost-effective, and increases on-site productivity.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • PERI's tall order in Mexico
    February 14, 2012
    The Baluarte Bridge (Puente Baluarte), part of a major highway project, ranks among the most outstanding infrastructure projects ever constructed in Mexico.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap