Skip to main content

ABM expands range of its pre-stressed concrete bridge beams

ABM reports that investment manufacturing equipment at its UK factory in Nottinghamshire is permitting production of an increased range of larger, heavier bridge components The new facility means that the company can now also manufacture U and W section prestressed concrete bridge beams of up to 120 tonnes. The company said that the additional capability means it can offer customers shorter cycle times, even for the heaviest and most complex beams, and a product of high and consistent quality. The dev
July 7, 2016 Read time: 2 mins
U and W section prestressed beams up to 120tonnes
ABM reports that investment manufacturing equipment at its UK factory in Nottinghamshire is permitting production of an increased range of larger, heavier bridge components

The new facility means that the company can now also manufacture U and W section prestressed concrete bridge beams of up to 120 tonnes. The company said that the additional capability means it can offer customers shorter cycle times, even for the heaviest and most complex beams, and a product of high and consistent quality.

The development follows a careful examination of some of the leading beam casting facilities in Europe. The object was to create an adaptable process that not only offers rapid output but that can be quickly changed to produce different types of beams.

Reinforcements and stressing components are prefabricated off line, so these can be craned into the moulds and tensioned prior to the concrete pour. Controlled heating of the moulds then speeds the strengthening of the concrete to the point where tensioning can be released.

Curing advances rapidly in the temperature controlled environment permitting beams to attain the necessary strength for stress-load transfer using sequence controlled mass de-tensioning hydraulic rams.

ABM business development manager Mike Sanderson said that the new plant is 64m long. “With our increased 120tonnes lift capacity this gives us the capability to produce the largest bridge beams in the UK or multiples of smaller units. No other pre-cast concrete manufacturer on the UK mainland has the capacity for these large beams, this flexibility and such an extensive product range,” he said.

The first W-section beams were cast in January. In addition to offering the largest range of conventional bridge beams, ABM also manufactures a range of bespoke reinforced concrete components for the civil engineering sector along with its unique Arch and Portal Frame system which maximises the use of geotechnical engineering to produce efficient and rapidly installed bridge systems. With sister companies across Europe, ABM has unprecedented access to expertise and technology for the production of pre-cast concrete structures.

Related Content

  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • São Paulo's landmark bridge construction
    February 21, 2012
    To improve access from the east to São Paulo city centre, main contractor Construbase Engenharia is building a road complex comprising three viaducts and access ramps. The greatest challenge in Brazil's largest city is the showpiece Padre Adelino viaduct, a 122m long single-arch, single-span, cable-stayed concrete bridge moulded in situ with a parabola-shaped arch and a single-cell post-tensioned cantilever caisson
  • Strengthen it with Sika’s CarboDur
    February 5, 2020
    Rather than use steel reinforcement to strengthen columns, beams, slabs and wall, specifiers are turning to carbon fibre, according to Switzerland-based Sika.
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642