Skip to main content

Technology from Topcon plays key role in resurfacing race track

Located in northern Iceland, Akureyri is the fourth largest town in the country, with a modest population of 19,000. The town is home to one of Iceland’s oldest car racing clubs, the Akureyri Car Club, which runs regular drag racing events. However, its popularity resulted in heavy wear and tear, which meant the quarter-of-a-mile drag race strip was in urgent need of an upgrade.
May 13, 2021 Read time: 3 mins
Technology from Topcon played a key role in resurfacing a drag race circuit in Iceland

The owners needed the job completing efficiently and with minimal disruption and turned to local contractor Malbikun Norðurlands. To ensure a quality finish, the firm opted to use equipment from Topcon Positioning Group, in particular the advanced SmoothRide machine control system, to ensure that the track would be smooth and level. The contractor knew that it needed to use accurate equipment and approached Verkfæri, the Icelandic Topcon dealer. By using SmoothRide for the job, the firm was able to achieve the high accuracy required.

The SmoothRide system covers the tasks from scanning and design to laying the asphalt. According to Oliver Gustáfsson at Verkfæri, the Topcon dealer for Iceland, this allowed the operation to run seamlessly and without any problems. He said, “The solution is not only accurate, but also estimates volumes, which make a difference when ordering the asphalt and managing the project.”

Luca Nocentini, Senior 3D Paving Application Specialist at Topcon said: “SmoothRide was the perfect fit for The Akureyri Car Club drag strip."

According to Topcon, using the advanced machine control technology made it possible to obtain an accurate design of the straight-line track to define what needed to be fixed.

The scanning was completed by instruments attached to the back of a truck and the data was then used to develop the design that the milling machines could work from, only removing the material needed to avoid unnecessary work. Then the paving machinery was able to pave new asphalt over the top to the correct thickness required to deliver a smooth finish. This system minimised wastage, as well as being more cost-effective and also quick.

The technology ensures thickness control, while also accounting for differential compaction dictated by the surface, which reduces the number of lifts required. This cuts costs, improves material management and keeps the project on schedule.

In order to provide tight vertical control and precise guidance, the RD-MC system is built on a tried and tested solution, Topcon’s sonic tracker. The technology package helps to provide the most versatile solution, by also including a GNSS receiver to position the equipment and resurface variable amounts of asphalt according to the design. The reliable data it collects is also fundamental for the client to obtain precise offers from contractors, further saving time, lowering costs, and increasing safety.

Racetrack maintenance is traditionally a time-consuming and costly process, with tracks needing to be closed for the work to take place, interfering with race fixtures and events. By using technology such as SmoothRide, the racetrack could be resurfaced in the most cost-effective and efficient way possible.

For more information on companies in this article

Related Content

  • Sustainable Construction with Topcon
    February 7, 2024
    Michael Gomes, vice president of sustainability and corporate social responsibility at Topcon, talks to Mike Woof, editor of World Highways magazine, about the use of technology to deliver sustainability in road construction.
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen
  • Speedy airport upgrade
    February 15, 2012
    Increases in flight numbers from the Frankfurt Hahn airport have resulted in necessary improvements to the facility, including new runway surfaces. The former German military airbase has been used as a civilian airport since 1993 but is now Germany's fifth largest air cargo hub and handles some 40,000 flights/year.
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.