Skip to main content

Fugro consulting for Amsterdam Zuidasdok project

Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are Fluor, Heijmans and HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it. The A10 South is one of the busiest highways in The Netherlands and
March 2, 2017 Read time: 2 mins
6202 Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are 6343 Fluor, 1271 Heijmans and 981 HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it.

The A10 South is one of the busiest highways in The Netherlands and suffers heavy congestion at peak periods, particularly at junctions S108 and S109 often during rush hour. The new proposed highway will be extended to eight lanes for through traffic and four lanes for local traffic. Improvements will also extend to the ‘De Nieuwe Meer’ and ‘Amstel’ junctions and include the construction of a new Amsterdam South railway station.

The Zuidasdok project is essential for accessibility to the Zuidas business district. Placing a stretch of the highway in a tunnel will provide space for a new public area and the new Amsterdam South railway station, turning it into a public transport hub. Due to the interconnected nature of the urban road and rail network, the Zuidasdok is a joint project of the Municipality of Amsterdam, the Dutch Rail Infrastructure Manager (ProRail) and Directorate-General of Public Works and Water Management (Rijkswaterstaat).

As a strategic partner to the ZuidPlus partners, Fugro will provide monitoring expertise, geotechnical risk management consulting services, soil investigations and data acquisition throughout the re-baseline phase and ultimate realisation of the project. Fugro and ZuidPlus will use a sophisticated monitoring approach to manage geotechnical risk.

Planning and construction will commence in 2019 and the project is expected to be completed around 2028.

For more information on companies in this article

Related Content

  • Made to Measure laser mapping
    June 26, 2012
    Dutch surveying company Geomaat says it is taking millimetre accurate measurements in record time to aid a range of highway design, construction and maintenance projects. Using the mobile laser mapping system StreetMapper, and specially developed point cloud software, Geomaat says it can calculate highly accurate cutting, milling and asphalt figures, create as built models and undertake change detection.
  • David Barwell suggests six steps for closing the UK funding gap
    January 11, 2019
    Six steps for closing the UK funding gap Plenty of private money is seeking UK investment opportunities. The government and the infrastructure sector in general must make projects more attractive, writes David Barwell* It is widely acknowledged that the UK faces mounting economic, environmental and social problems if the nation's infrastructure fails to meet present and future demands. Government estimates propose that almost €561 billion is required to bridge the infrastructure funding gap. As part o
  • Vinci among Comol5 members for the Netherlands’ Rijnland Route
    January 31, 2017
    The Dutch province of South Holland has awarded the contract for building the Rijnland Route to the consortium Comol5, according to consortium member Vinci. Rijnland Route will connect Katwijk, via the A44, to the A4 at Leiden. Comol5 consists of TBI companies Mobilis and Croonwolter&dros (25% each), DIMCO - DEME Infra Marine Contractors - (25%) and Vinci Construction Grands Projets (25%). Value of the contract is €492 million. The consortium will be responsible for the reconstruction of the Leiden
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well