Skip to main content

Fugro consulting for Amsterdam Zuidasdok project

Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are Fluor, Heijmans and HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it. The A10 South is one of the busiest highways in The Netherlands and
March 2, 2017 Read time: 2 mins
6202 Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are 6343 Fluor, 1271 Heijmans and 981 HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it.

The A10 South is one of the busiest highways in The Netherlands and suffers heavy congestion at peak periods, particularly at junctions S108 and S109 often during rush hour. The new proposed highway will be extended to eight lanes for through traffic and four lanes for local traffic. Improvements will also extend to the ‘De Nieuwe Meer’ and ‘Amstel’ junctions and include the construction of a new Amsterdam South railway station.

The Zuidasdok project is essential for accessibility to the Zuidas business district. Placing a stretch of the highway in a tunnel will provide space for a new public area and the new Amsterdam South railway station, turning it into a public transport hub. Due to the interconnected nature of the urban road and rail network, the Zuidasdok is a joint project of the Municipality of Amsterdam, the Dutch Rail Infrastructure Manager (ProRail) and Directorate-General of Public Works and Water Management (Rijkswaterstaat).

As a strategic partner to the ZuidPlus partners, Fugro will provide monitoring expertise, geotechnical risk management consulting services, soil investigations and data acquisition throughout the re-baseline phase and ultimate realisation of the project. Fugro and ZuidPlus will use a sophisticated monitoring approach to manage geotechnical risk.

Planning and construction will commence in 2019 and the project is expected to be completed around 2028.

For more information on companies in this article

Related Content

  • Netherlands road widening deal for Fugro
    April 22, 2020
    A road widening contract in the Netherlands is being handled by Fugro.
  • Netherlands highway stretch opens
    November 23, 2018
    The widened and upgraded A27/A1 highway stretches in the Netherlands have been officially opened to traffic. The upgraded highways connect Utrecht North and the Eemnes Junction, as well as the A1 highway between the Eemnes Junction and the Bunschoten-Spakenburg connection. The project was delivered two months ahead of schedule.
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove
  • Fugro to use its ARAN system in Dutch surveying deal
    May 9, 2019
    Fugro, a geo-data specialist, is using the latest version of its Automatic Road Analyser (ARAN) in a new five-year pavement survey contract for Dutch highways. The contract, with an option to extend to 10 years, was awarded by the Dutch infrastructure agency Rijkswaterstaat. It includes the collection of surface condition and road measurement data from 8,600km of principal highways each year. The company’s Automatic Road Analyser - ARAN - which is adapted to meet European specifications and includes i