Skip to main content

Fugro consulting for Amsterdam Zuidasdok project

Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are Fluor, Heijmans and HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it. The A10 South is one of the busiest highways in The Netherlands and
March 2, 2017 Read time: 2 mins
6202 Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are 6343 Fluor, 1271 Heijmans and 981 HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it.

The A10 South is one of the busiest highways in The Netherlands and suffers heavy congestion at peak periods, particularly at junctions S108 and S109 often during rush hour. The new proposed highway will be extended to eight lanes for through traffic and four lanes for local traffic. Improvements will also extend to the ‘De Nieuwe Meer’ and ‘Amstel’ junctions and include the construction of a new Amsterdam South railway station.

The Zuidasdok project is essential for accessibility to the Zuidas business district. Placing a stretch of the highway in a tunnel will provide space for a new public area and the new Amsterdam South railway station, turning it into a public transport hub. Due to the interconnected nature of the urban road and rail network, the Zuidasdok is a joint project of the Municipality of Amsterdam, the Dutch Rail Infrastructure Manager (ProRail) and Directorate-General of Public Works and Water Management (Rijkswaterstaat).

As a strategic partner to the ZuidPlus partners, Fugro will provide monitoring expertise, geotechnical risk management consulting services, soil investigations and data acquisition throughout the re-baseline phase and ultimate realisation of the project. Fugro and ZuidPlus will use a sophisticated monitoring approach to manage geotechnical risk.

Planning and construction will commence in 2019 and the project is expected to be completed around 2028.

For more information on companies in this article

Related Content

  • Road construction in Ghana
    August 23, 2022
    A new generation asphalt plant has proved its worth for the construction of an important road link in Ghana.
  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • Fugro plans UK road conference for July
    April 24, 2013
    Survey specialist Fugro is setting out plans for an upcoming highways seminar, which will be held in July 2013 in Birmingham. The firm has been involved with the Developments in Pavement Assessment conference for the last 12 years and is now relaunching the event with a broader view to include all elements of the highway network. The 13th edition of the one day conference is now being retitled Developments in Highways Assessment (DIHA). The event is aimed at highway engineers, network and asset managers, th
  • India plans major infrastucture investment
    February 10, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports. On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt.