Skip to main content

Surveying offering

Leica Geosystems is broadening its surveying range with the introduction of three aluminium construction tripods. The two mid-range tripods, the CTP104 and CTP104D, can cope with tough conditions on site and are designed for use with Leica Geosystems levels, lasers and construction theodolites. Both employ quick-release clamps for fast stable setups. The high specification CET103 elevating tripod has an adjustable column with 300mm crank stroke and an additional telescope column for 660mm extension. Minimum
July 4, 2012 Read time: 1 min
RSS265 Leica Geosystems is broadening its surveying range with the introduction of three aluminium construction tripods. The two mid-range tripods, the CTP104 and CTP104D, can cope with tough conditions on site and are designed for use with Leica Geosystems levels, lasers and construction theodolites. Both employ quick-release clamps for fast stable setups. The high specification CET103 elevating tripod has an adjustable column with 300mm crank stroke and an additional telescope column for 660mm extension. Minimum working height is 840mm and it features a bubble for easy adjustment, mm-scale for exact height adjustment indoors and rubber feet for use on slippery surfaces.

In addition, two new packages have been introduced for the Leica Jogger level. These include a Leica Jogger 20 or 24 automatic level, a lightweight aluminum tripod, telescopic staff and a carrying bag for staff and tripod.

For more information on companies in this article

Related Content

  • Making a base
    July 20, 2012
    Soil stabilisation offers a cost effective solution for road construction in the right conditions Ensuring the soil underneath the aggregate base of a road has been stabilised with cement, lime or fly-ash can provide a greater working life and a reduced risk of problems that can arise as the road ages, such as subsidence. The technology works particularly well in ground with high clay content and where there are local shortages of stone for use in aggregates. Reducing the need for aggregates where they are
  • Next-generation materials testing with new technology
    August 17, 2022
    The US’s Balanced Mix Design sets the stage for next-generation performance testing, according to CONTROLS’ Andrea Carlessi
  • Berco bounces back
    December 16, 2021
    The global Italian undercarriage manufacturer is forging ahead with a major lean manufacturing transformation that is already seeing results. David Arminas reports from the company’s 500,000m² plant in Copparo.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.