Skip to main content

Streetworks management

New software from Mayrise Systems is designed to allow local authorities to improve street works. Contractors use permits to restrict works to fixed dates and conditions and the latest version of the Mayrise Street Works software allows better scheduling of operations. The package can be used to manage notices, updates and the tracking of works status with automated alerts on over-running work. It also offers integrated MapNow mapping to provide a quick visual works locator, geographic sites analysis and fo
July 19, 2012 Read time: 1 min
New software from 2606 Mayrise Systems is designed to allow local authorities to improve street works. Contractors use permits to restrict works to fixed dates and conditions and the latest version of the Mayrise Street Works software allows better scheduling of operations. The package can be used to manage notices, updates and the tracking of works status with automated alerts on over-running work. It also offers integrated MapNow mapping to provide a quick visual works locator, geographic sites analysis and forward planner.

For more information on companies in this article

Related Content

  • Bentley expanding capabilities with new deals
    April 30, 2018
    Bentley Systems is acquiring Plaxis, a Netherlands-based provider of geotechnical software. In addition, Bentley also has an agreement to acquire soil engineering software provider SoilVision, based in Saskatchewan, Canada. The acquisitions develop Bentley’s capabilities in the geotechnical sector. These deals allow BIM advancements to be extended to subsurface engineering for infrastructure projects. Projects commence with geotechnical surveys and sampling, captured with Bentley’s gINT for versatile
  • Asphalt advances and industry innovations in paving
    May 20, 2014
    Asphalt paving technology continues to develop, benefiting from new technologies and new diesel engines - Mike Woof reports The asphalt paving equipment market is seeing the introduction of new low emission engines that will meet the Tier 4 Final regulations for Europe and North America. These have required some major engineering changes, with firms now having to install bulky exhaust after-treatment systems and additional cooling for engines and turbos.
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • New soil compactors round out Atlas Copco’s range
    December 20, 2013
    Atlas Copco has completed the introduction of its fifth generation soil compactor range with the roll-out of the compact CA models. The new Dynapac CA1300 and CA1500 machines share features with the larger machines launched earlier this year, with a focus on reduced operating costs, low operating noise and fuel consumption and ease of servicing.