Skip to main content

Piling accurately with Trimble’s new tool

Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods. “Engineered for ease of use, Trim
June 10, 2019 Read time: 4 mins
Using the new system allows drilling operations to be optimised, delivering better blasting accuracy
2122 Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods.


“Engineered for ease of use, Trimble Groundworks features an updated, intuitive user interface designed for construction environments,” said Scott Crozier, general manager for Trimble’s Civil Engineering and Construction Division. “Contractors can achieve centimetre-level accuracy with stakeless navigation, which reduces rework and decreases the need for personnel working near the machine during operation.”

The system features a touchscreen control, with full colour graphics and is said to be easy to learn. The large screen is also said to be easy to read, even in bright sunlight, while the firm says that operators can personalise the interface to match their workflow. In addition, a variety of configurable views make it easier for users to achieve maximum productivity. The software is designed for full integration with other solutions in the Trimble Civil Engineering and Construction portfolio to make company-wide training faster and easier.

The Trimble Groundworks system is said to give contractors the ability to drill at the specified location and to the required depth, orientation and inclination angle, with a higher degree of accuracy than with conventional methods. This is a key issue as being able to drill blastholes to the specified design more accurately will result in better rock fragmentation and lower hauling costs. This also minimises the problems of excess fines or overbeak, while providing a flatter floor to the blasted area. These better results can be achieved by optimising drill hole spacing, angles, and the location of the machine for a more even blasting pattern.

The auto stop feature helps by automatically stopping drilling at target elevation to reduce overdrilling, leading to flatter benches and reduced wear and tear on loading and hauling machines, delivering further cost savings. With a more consistent size range for blasted material, wear and tear is also reduced on the crushing and screening equipment. Wastage of blasted material is reduced and there is less of a need for secondary breaking, further reducing operating costs at a quarry. Overall, the importance of an optimised blasting operation cannot be over-emphasised for a quarry operation and can make the difference between a site being cost-effective or losing money.


Minimising the need for stakes and construction surveying, Trimble Groundworks can help promote jobsite safety by reducing the number of people working near the machine while drilling. Also, avoidance zones can be set to keep operators from entering hazardous areas. With Trimble Groundworks, machines can operate 24 hours/day and 7 days/week in almost any conditions, decreasing the chance of delays due to darkness or inclement weather.

Meanwhile, the accuracy of the system enables contractors to increase operational efficiency and reduce surveying costs associated with staking and as-built checks. Accurate positioning in Trimble Groundworks can ensure that navigation time between piles is reduced. Less time moving the machine and more time piling maximises daily production, which can result in increased revenue.

Built-in, automated quality assurance and quality control reporting includes the capture of start and end positions, time and elevation as well as actual embedment depth, blow count reporting, and inclination and orientation control. In addition, the system logins allow managers to filter reports by operator for better accountability, production optimisation and forecasting.

Using the system for piling work allows this portion of a construction operation to be optimised and incorporated into BIM practices. Data can be analysed and recorded as part of the site model for future reference.

For more information on companies in this article

Related Content

  • Rock Hawg shows cutting edge
    February 28, 2012
    A new machine described as an excavator, trencher and crusher is the first of its type operating in the UK and Europe. Westquay Trading, the exclusive distributors for Tesmec products, has introduced the first 126tonne Rock Hawg, which has been sold to contractor A J Gammond of Malvern, England, pioneers of the use of the machines in the UK and Ireland.
  • Construction trends in North America, looking to the future
    June 10, 2019
    Exciting changes in construction will reward the aware contractor - *Jeff Winke comments Hop in a car and drive anywhere in the US and chances are the drive will be on roads and highways that need patching, resurfacing, or widening, and bridges often show signs of needed maintenance. Sadly, things are in bad shape. On the last two report cards from the American Society of Civil Engineers, the US infrastructure scored a D+. This year’s report urges the government and private sector to increase spending
  • Several key highway construction innovations will be unveiled at the Intermat show
    February 23, 2012
    Several key highway construction innovations will be unveiled at the Intermat show. Road construction technology will form a major part of the Intermat exhibition, with major manufacturers such as Ammann, Bernardi Impianti, Caterpillar, the Fayat Group, GOMACO, Roadtec, Volvo and the Wirtgen Group all unveiling new technologies. Improved roadway performance is vital to ensuring longer life highways, minimised maintenance needs, reduced congestion and improved safety and several new systems will help boost q
  • Trimble and OEMs extend technology deal
    December 13, 2024
    Trimble is extending its technology deals with Caterpillar and John Deere.