Skip to main content

Piling accurately with Trimble’s new tool

Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods. “Engineered for ease of use, Trim
June 10, 2019 Read time: 4 mins
Using the new system allows drilling operations to be optimised, delivering better blasting accuracy
2122 Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods.


“Engineered for ease of use, Trimble Groundworks features an updated, intuitive user interface designed for construction environments,” said Scott Crozier, general manager for Trimble’s Civil Engineering and Construction Division. “Contractors can achieve centimetre-level accuracy with stakeless navigation, which reduces rework and decreases the need for personnel working near the machine during operation.”

The system features a touchscreen control, with full colour graphics and is said to be easy to learn. The large screen is also said to be easy to read, even in bright sunlight, while the firm says that operators can personalise the interface to match their workflow. In addition, a variety of configurable views make it easier for users to achieve maximum productivity. The software is designed for full integration with other solutions in the Trimble Civil Engineering and Construction portfolio to make company-wide training faster and easier.

The Trimble Groundworks system is said to give contractors the ability to drill at the specified location and to the required depth, orientation and inclination angle, with a higher degree of accuracy than with conventional methods. This is a key issue as being able to drill blastholes to the specified design more accurately will result in better rock fragmentation and lower hauling costs. This also minimises the problems of excess fines or overbeak, while providing a flatter floor to the blasted area. These better results can be achieved by optimising drill hole spacing, angles, and the location of the machine for a more even blasting pattern.

The auto stop feature helps by automatically stopping drilling at target elevation to reduce overdrilling, leading to flatter benches and reduced wear and tear on loading and hauling machines, delivering further cost savings. With a more consistent size range for blasted material, wear and tear is also reduced on the crushing and screening equipment. Wastage of blasted material is reduced and there is less of a need for secondary breaking, further reducing operating costs at a quarry. Overall, the importance of an optimised blasting operation cannot be over-emphasised for a quarry operation and can make the difference between a site being cost-effective or losing money.


Minimising the need for stakes and construction surveying, Trimble Groundworks can help promote jobsite safety by reducing the number of people working near the machine while drilling. Also, avoidance zones can be set to keep operators from entering hazardous areas. With Trimble Groundworks, machines can operate 24 hours/day and 7 days/week in almost any conditions, decreasing the chance of delays due to darkness or inclement weather.

Meanwhile, the accuracy of the system enables contractors to increase operational efficiency and reduce surveying costs associated with staking and as-built checks. Accurate positioning in Trimble Groundworks can ensure that navigation time between piles is reduced. Less time moving the machine and more time piling maximises daily production, which can result in increased revenue.

Built-in, automated quality assurance and quality control reporting includes the capture of start and end positions, time and elevation as well as actual embedment depth, blow count reporting, and inclination and orientation control. In addition, the system logins allow managers to filter reports by operator for better accountability, production optimisation and forecasting.

Using the system for piling work allows this portion of a construction operation to be optimised and incorporated into BIM practices. Data can be analysed and recorded as part of the site model for future reference.

For more information on companies in this article

Related Content

  • Leica iCON grade iGD4 increases dozer functionality
    January 6, 2017
    The Leica iCON grade iGD4 solution which enables one dozer to do multiple types of grading work with speed and accuracy was launched has been launched at Conexpo 2014. The highly accurate and efficient iCON grade iGD4 dozer solution calculates the lift, angle, and tilt of the dozer’s six-way blade. It allows operators to angle their blade while iCON grade’s advanced hydraulic control system automatically controls the blade’s lift and tilt. As a result, dozers can now be run at the full extent of their capa
  • Leica iCON grade iGD4 increases dozer functionality
    March 6, 2014
    The Leica iCON grade iGD4 solution which enables one dozer to do multiple types of grading work with speed and accuracy was launched has been launched at Conexpo 2014. The highly accurate and efficient iCON grade iGD4 dozer solution calculates the lift, angle, and tilt of the dozer’s six-way blade. It allows operators to angle their blade while iCON grade’s advanced hydraulic control system automatically controls the blade’s lift and tilt. As a result, dozers can now be run at the full extent of their capa
  • Asphalt compaction answer
    February 8, 2012
    A new generation of asphalt compaction technology is coming to market, reports Mike Woof. The market for rubber tyred compactors has grown in recent years, prompting manufacturers to develop a new generation of machines.
  • Trimble technology centre stage at CONEXPO-CON/AGG 2014
    March 27, 2014
    The Trimble Quantm alignment planning system, on show at CONEXPO/CON-AGG 2014, allows road designers to cut planning time and deliver projects with little environmental and social impact at a reduced cost. The system analyses millions of alignment alternatives and returns a range of options to the planning team for consideration. When new data becomes available the Quantm system can quickly recalculate more alignment options.