Skip to main content

Piling accurately with Trimble’s new tool

Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods. “Engineered for ease of use, Trim
June 10, 2019 Read time: 4 mins
Using the new system allows drilling operations to be optimised, delivering better blasting accuracy
2122 Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods.


“Engineered for ease of use, Trimble Groundworks features an updated, intuitive user interface designed for construction environments,” said Scott Crozier, general manager for Trimble’s Civil Engineering and Construction Division. “Contractors can achieve centimetre-level accuracy with stakeless navigation, which reduces rework and decreases the need for personnel working near the machine during operation.”

The system features a touchscreen control, with full colour graphics and is said to be easy to learn. The large screen is also said to be easy to read, even in bright sunlight, while the firm says that operators can personalise the interface to match their workflow. In addition, a variety of configurable views make it easier for users to achieve maximum productivity. The software is designed for full integration with other solutions in the Trimble Civil Engineering and Construction portfolio to make company-wide training faster and easier.

The Trimble Groundworks system is said to give contractors the ability to drill at the specified location and to the required depth, orientation and inclination angle, with a higher degree of accuracy than with conventional methods. This is a key issue as being able to drill blastholes to the specified design more accurately will result in better rock fragmentation and lower hauling costs. This also minimises the problems of excess fines or overbeak, while providing a flatter floor to the blasted area. These better results can be achieved by optimising drill hole spacing, angles, and the location of the machine for a more even blasting pattern.

The auto stop feature helps by automatically stopping drilling at target elevation to reduce overdrilling, leading to flatter benches and reduced wear and tear on loading and hauling machines, delivering further cost savings. With a more consistent size range for blasted material, wear and tear is also reduced on the crushing and screening equipment. Wastage of blasted material is reduced and there is less of a need for secondary breaking, further reducing operating costs at a quarry. Overall, the importance of an optimised blasting operation cannot be over-emphasised for a quarry operation and can make the difference between a site being cost-effective or losing money.


Minimising the need for stakes and construction surveying, Trimble Groundworks can help promote jobsite safety by reducing the number of people working near the machine while drilling. Also, avoidance zones can be set to keep operators from entering hazardous areas. With Trimble Groundworks, machines can operate 24 hours/day and 7 days/week in almost any conditions, decreasing the chance of delays due to darkness or inclement weather.

Meanwhile, the accuracy of the system enables contractors to increase operational efficiency and reduce surveying costs associated with staking and as-built checks. Accurate positioning in Trimble Groundworks can ensure that navigation time between piles is reduced. Less time moving the machine and more time piling maximises daily production, which can result in increased revenue.

Built-in, automated quality assurance and quality control reporting includes the capture of start and end positions, time and elevation as well as actual embedment depth, blow count reporting, and inclination and orientation control. In addition, the system logins allow managers to filter reports by operator for better accountability, production optimisation and forecasting.

Using the system for piling work allows this portion of a construction operation to be optimised and incorporated into BIM practices. Data can be analysed and recorded as part of the site model for future reference.

For more information on companies in this article

Related Content

  • Leica Geosystems introduces smart monitoring of structures
    October 1, 2014
    Highly sophisticated, the Leica GeoMoS Now! From Leica Geosystems is a new web-based application enables on-the-go visualisation and analysis of structural and ground movement monitoring data. With this package, large quantities of geodetic and geotechnical data are said to be easier to handle with simplified workflows using automatic configuration and distribution tools. The package can quickly notify users of any changes in data for faster, more informed responses. Leica GeoMoS Now! allows users t
  • Aggregates production innovations delivering efficiency
    August 1, 2017
    EvoQuip, the newest division of Terex Corporation, is launching a Cobra 230 impact crusher later this year, to sit alongside the Cobra 260. The 24tonne machine will offer a production capacity of 140-150tonnes/hour in asphalt and construction recycling. The Cobra 230 is 11.3m long and 2.46m wide, or 5.15m wide with a side conveyor. It features a quick set-up time and the machine can be moved onsite without having to stop the crusher. Keestrack says that its novel H4 tracked cone crusher is light and compact
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Innovation abounds at the smaller end of the compaction equipment sector
    August 22, 2013
    New machines are now being offered at the compact end of the asphalt compaction market - Mike Woof reports Manufacturers have developed an array of new machines and solutions for the compact end of the asphalt compactor market segment. These units have been designed to meet the latest regulations for Europe and the US, with low emission engines that are also more economical on fuel. But as these machines are made in large volumes, the market for smaller asphalt compactors sees fierce rivalry between fi