Skip to main content

Not lost in translation – detecting BIM changes

A new package from 3D Repo offers effective real-time BIM change detection. This cloud-based change detection software can be used for 3D construction models to avert BIM issues from unregistered changes. This solution is said to provide a fast and reliable way to detect changes in underlying 3D models, using an encrypted web browser. The patent pending innovation operates on any 3D models, regardless of their file type, software used to produce them or file size. Called 3D Diff, the 3D Repo solution also a
May 22, 2018 Read time: 2 mins
A new package from 3D Repo offers effective real-time BIM change detection. This cloud-based change detection software can be used for 3D construction models to avert BIM issues from unregistered changes. This solution is said to provide a fast and reliable way to detect changes in underlying 3D models, using an encrypted web browser. The patent pending innovation operates on any 3D models, regardless of their file type, software used to produce them or file size. Called 3D Diff, the 3D Repo solution also allows users to share visualisations with project partners and stakeholders irrespective of location or time-zone.


The change detection algorithm allows users to mix and match models from different modelling tools and pipelines and still identify what has changed over time between revisions. This tool is important for design coordination stages, and also throughout construction when contractors introduce as-built models. It is important too for litigation to attribute who did what for legal liabilities and financial claims.

By comparing the actual geometry of a model rather than underlying, software specific object IDs or labels, 3D Diff can detect changes between models from different sources. A user can pass 3D models from PDMS to Navisworks as well as to 7981 Tekla due to project specific requirements. Without 3D Diff, there is no way of verifying what data has been lost in translation from one package to the next. 3D Diff runs in real time, regardless of the model file size, so even complex projects can be checked quickly.

The firm says that this fast, effective, software independent solution for change and clash detection requires no installation of desktop software. Data is encrypted and project privileges, such as view only or edit, can be assigned to individual project partners.

For more information on companies in this article

Related Content

  • Roads to Recovery after the pandemic
    January 11, 2021
    IRF president Bill Halkias shares the Federation’s view on post-Covid
  • Symology supplies the foundations for Tarmac’s Street Works business
    April 7, 2017
    UK contractor Tarmac has been in partnership with Symology since 2011, using a shared management service for asset management to meet tougher government street work regulations, writes Matt Waite Tarmac, with more than 6,600 employees, is the UK’s leading sustainable building materials and construction solutions business. The company has over 330 UK sites from which it delivers contracting and highways maintenance services as well as products such as aggregates, asphalt, cement, lime and ready-mix concre
  • Site safety system benefit
    September 14, 2022
    Leica Geosystems says that its new safety awareness module can reduce risks on working construction sites. The Leica ConX Safety Awareness Module forms part of the firm’s Leica ConX cloud solution. According to the company, the integration of Leica Geosystems’ safety awareness solutions with ConX increases safety on construction sites by collecting and visualising data that improves awareness, speeds up hazard response and provides better insights.
  • Securing safer transportation infrastructure through non-destructive technology
    June 16, 2014
    Kevin Vine reports on the use of non-destructive testing for structural analysis of bridges Seven years ago, the overpass collapse in Laval, Québec that led to the death of five people brought to light severe issues with the state of the country’s bridges and transportation infrastructure. More recently, a crack in the Champlain Bridge to Montreal that forced over 160,000 commuters to find alternate routes to work reaffirmed a need for greater emphasis on early detection before a crisis occurs.