Skip to main content

Not lost in translation – detecting BIM changes

A new package from 3D Repo offers effective real-time BIM change detection. This cloud-based change detection software can be used for 3D construction models to avert BIM issues from unregistered changes. This solution is said to provide a fast and reliable way to detect changes in underlying 3D models, using an encrypted web browser. The patent pending innovation operates on any 3D models, regardless of their file type, software used to produce them or file size. Called 3D Diff, the 3D Repo solution also a
May 22, 2018 Read time: 2 mins
A new package from 3D Repo offers effective real-time BIM change detection. This cloud-based change detection software can be used for 3D construction models to avert BIM issues from unregistered changes. This solution is said to provide a fast and reliable way to detect changes in underlying 3D models, using an encrypted web browser. The patent pending innovation operates on any 3D models, regardless of their file type, software used to produce them or file size. Called 3D Diff, the 3D Repo solution also allows users to share visualisations with project partners and stakeholders irrespective of location or time-zone.


The change detection algorithm allows users to mix and match models from different modelling tools and pipelines and still identify what has changed over time between revisions. This tool is important for design coordination stages, and also throughout construction when contractors introduce as-built models. It is important too for litigation to attribute who did what for legal liabilities and financial claims.

By comparing the actual geometry of a model rather than underlying, software specific object IDs or labels, 3D Diff can detect changes between models from different sources. A user can pass 3D models from PDMS to Navisworks as well as to 7981 Tekla due to project specific requirements. Without 3D Diff, there is no way of verifying what data has been lost in translation from one package to the next. 3D Diff runs in real time, regardless of the model file size, so even complex projects can be checked quickly.

The firm says that this fast, effective, software independent solution for change and clash detection requires no installation of desktop software. Data is encrypted and project privileges, such as view only or edit, can be assigned to individual project partners.

For more information on companies in this article

Related Content

  • High performance, high mobility of wheeled pavers
    February 14, 2012
    New generation wheeled pavers aimed at use in territories such as the UK, Italy, South Africa and Southern Germany are now coming to market. Pavers in these countries are often expected to be driven from one part of a site to another or for short distances, which is why the additional mobility of the wheeled machine is preferred in many instances over similarly-sized tracked models. This preference for wheeled units comes in spite of the greater stability offered by tracked machines. BOMAG, Caterpillar and
  • Gomaco smooth the way for new NY State concrete highway
    April 2, 2014
    When New York State Thruway wanted to experiment with unbonded concrete overlays, they chose an 8km, four-lane section of Interstate 90 near Hamburg as their test section. Surianello General Concrete, based in Buffalo, New York, won the bid to pave the 22.9cm thick concrete overlay. The age and the design of the original roadway created a major paving challenge. It was built in the 1950s and didn’t conform to current geometry requirements for superhighways. “They built it with a standard crown sectio
  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Widening works: road user’s nightmare or operator’s challenge?
    March 14, 2017
    Early - and continuous planning - is essential for successful road widening projects. By Nina Sacagiu, project manager, and Laurent Charles-Nicolas, project director, at Egis. Keeping goods and people moving safely is the primary objective of any transport authority across the world. Delivering this objective on motorways and making the most out of network capacity requires all the resources, skills and ingenuity of those in charge of managing the infrastructure. When the network can no longer cope wit