Skip to main content

New turning simulation programme from Savoy

Savoy Computing has released a new version of its turning simulation program Autotrack 11, which extends and updates its support for a wide variety of base platforms as well as introducing new features. The software now supports the latest AutoCAD 2014, AutoCAD Civil 3D 2014 and other AutoCAD 2014 verticals and also will run in Bentley programs such as InRoads, MX and Power Civil. Updates for Bentley include support for full 3-axis vehicle rock and roll on 3D surface terrains, vertical headroom clearance an
August 22, 2013 Read time: 2 mins
RSS2902 Savoy Computing has released a new version of its turning simulation program Autotrack 11, which extends and updates its support for a wide variety of base platforms as well as introducing new features. The software now supports the latest 3282 AutoCAD 2014, AutoCAD Civil 3D 2014 and other AutoCAD 2014 verticals and also will run in Bentley programs such as InRoads, MX and Power Civil. Updates for 4019 Bentley Systems include support for full 3-axis vehicle rock and roll on 3D surface terrains, vertical headroom clearance and 3D grounding analysis in the latest v8i SS3 civil engineering releases running with Bentley OpenRoads technology.

The up and coming 2614 Bricsys system is also now catered for on both the 32-bit version and the new 64-bit BricsCAD 13.2. Savoy can provide BricsCAD bundled with AutoTrack.

New features in the program modules include improvements made to the body outline import facility in AutoTrack Roads Pro allowing scale and offset to be specified. New design libraries include India, Australia and updated Swedish design vehicles, and specific design vehicles for the US states of Wisconsin, Indiana & Tennessee. In AutoTrack Parking rows can now be created on curved alignments.

For more information on companies in this article

Related Content

  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Accurate deformation monitoring from Leica Geosystems
    March 7, 2017
    Leica Geosystems is now offering a sophisticated tool that allows engineers to measure deformation accurately. The Leica GeoMoS Now! Survey Edition is a service for monitoring and managing 3D deformation of points of potentially unstable areas for surveying projects. It has a streamlined workflow and can deliver monitoring reports of man-made structures or natural dangers to smart devices. Surveyors can use this to upload coordinates, process and visualise deformations, allowing other users to access result
  • Road repairs take to the air
    November 29, 2018
    Automated road repairs using 3D printing could save money and reduce disruption, reports Kristina Smith It’s the middle of the night and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road-repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location to protect the repair drone and divert traffic around it.
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l