Skip to main content

GSSI launches affordable RoadScan 30 GPR road inspection system

Geophysical Survey Systems (GSSI), a manufacturer of ground penetrating radar (GPR) equipment, has launched a more affordable version of its non-destructive system, called RoadScan 30. The system is designed for measuring pavement thickness, conducting base and sub-base evaluations and measuring available asphalt prior to milling operations. Hundreds of miles of pavement layer thickness data can be collected in a day. RoadScan 30 can collect data densities not obtainable using coring or other labour-i
May 11, 2015 Read time: 2 mins
RoadScan 30, easy on the wallet and very effective
Geophysical Survey Systems (8095 GSSI), a manufacturer of ground penetrating radar (GPR) equipment, has launched a more affordable version of its non-destructive system, called RoadScan 30.

The system is designed for measuring pavement thickness, conducting base and sub-base evaluations and measuring available asphalt prior to milling operations. Hundreds of miles of pavement layer thickness data can be collected in a day.

RoadScan 30 can collect data densities not obtainable using coring or other labour-intensive methods. Data can be acquired at highway speeds, eliminating the need for lane closures and providing a safer working environment by keeping crews out of traffic. The system’s road antennas are air-launched at a height of 46cm, so data quality is not affected by rough road conditions.

The RoadScan system includes a SIR 30 control unit paired with a 1.0 or 2.0 GHz horn antenna that provides superior data resolution. Additional components include a Smart ID module, a wheel-mounted distance measuring instrument (DMI), 7m control cable, transit case for the control unit, mounting kit and an AC adapter.

The SIR 30 control unit is a configurable multichannel system that operates one to four antennas simultaneously at high speeds. Flexible antenna mounting adapts to most vehicles.

GSSI says the RoadScan system delivers results quickly and efficiently, using ASCII output files for simple data transfer to other software programs. Results can also be output as Google Earth files. The system also features excellent integration with falling weight deflectometers and other devices that evaluate pavement structural capacity.

For more information on companies in this article

Related Content

  • IBI’s Routemapper charts new territory with Highways England
    September 14, 2016
    Mapping the asset High-speed data collection just got faster for England’s newly created strategic roads operator Highways England’s establishment as a publicly held company in 2015 created a need for a highly accurate asset inventory. This was potentially very costly and had serious safety implications. As well as its relationships with numerous managing agents and contractors, assets include 35,300km of highway, 12,100km of earthworks, 23,200km of safety fences, 150,000 technology assets and sig
  • Delivering the smoothest road surfaces
    May 26, 2021
    Roads and highways have to be monitored and maintained regularly to ensure they are safe for use, and surface smoothness is a key factor for road quality. However, for racetracks (and airport runways) surface smoothness is even more important for safety and performance
  • SICK’s LMS 1000 and RMS 1000 sensors deliver the goods
    January 7, 2019
    SICK says that it’s recently launched LMS1000 and MRS1000 infrared LiDAR sensors deliver more accurate and reliable distance sensing and measurement, especially in difficult conditions. The robust, compact sensors weigh just 1.2kg and come with rotatable connectors for easy mounting on gantries. Heavy rain, mist, dust or snow can lead to false signals, explained Neil Sandhu, SICK’s national product manager for imaging, measurement, ranging and systems. The addition of SICK’s triple-echo HDDM+ - High Defini
  • The Path to Climate-Neutral Road Construction
    October 1, 2023
    Machine manufacturers and construction companies around the globe are currently searching for ways to achieve the goal of climate-neutral construction. The challenge here is to successively reduce emissions of CO2 and other harmful gases (summarized to CO2 equivalents: CO2e) around the world to zero over the coming decades. In the road construction sector, this transformation is inextricably linked to the improvement and further development of production and working processes. In the future, machines and construction materials will also be assessed based on the climate-harmful emissions arising from their production and use. However, the focus should not be on individual machines, but on the entire process leading up to the finished product – a road. Ultimately, the decisive factor is the emissions generated per kilometer of newly built or rehabilitated road – the “CO2e per work done”.