Skip to main content

GPS controlled graders deliver a smooth surface

Birse has used two machine control systems on the A14 project in the UK, one GPS-controlled to provide excavators with a +/-30mm accuracy and a second system which used a Trimble UTS as control on a grader to achieve +/- 5mm - well within the Highway Agency's sub-base tolerance of +10/-30mm. This meant that when it came to the asphalt surface, Birse agreed a thickness and Lafarge, the blacktop contractor, let the paving machine run instead of the operators constantly making manual adjustments. At the end of
July 12, 2012 Read time: 1 min
1486 Birse has used two machine control systems on the A14 project in the UK, one GPS-controlled to provide excavators with a +/-30mm accuracy and a second system which used a 2122 Trimble UTS as control on a grader to achieve +/- 5mm - well within the Highway Agency's sub-base tolerance of +10/-30mm. This meant that when it came to the asphalt surface, Birse agreed a thickness and 3180 Lafarge, the blacktop contractor, let the paving machine run instead of the operators constantly making manual adjustments. At the end of the job, one of Birse's engineers looked at a 1km section of type 1 sub-base in detail. The average surface deviation on this tested carriageway was zero and local users of the A14 have even been phoning and emailing their approval of the smooth finish.

For more information on companies in this article

Related Content

  • SBS modified asphalt delivers added benefits
    February 17, 2012
    Special additives are used in asphalt mixes to give them added benefits as Patrick Smith reports
  • Cost effective road maintenance
    February 7, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a