Skip to main content

GPS controlled graders deliver a smooth surface

Birse has used two machine control systems on the A14 project in the UK, one GPS-controlled to provide excavators with a +/-30mm accuracy and a second system which used a Trimble UTS as control on a grader to achieve +/- 5mm - well within the Highway Agency's sub-base tolerance of +10/-30mm. This meant that when it came to the asphalt surface, Birse agreed a thickness and Lafarge, the blacktop contractor, let the paving machine run instead of the operators constantly making manual adjustments. At the end of
July 12, 2012 Read time: 1 min
1486 Birse has used two machine control systems on the A14 project in the UK, one GPS-controlled to provide excavators with a +/-30mm accuracy and a second system which used a 2122 Trimble UTS as control on a grader to achieve +/- 5mm - well within the Highway Agency's sub-base tolerance of +10/-30mm. This meant that when it came to the asphalt surface, Birse agreed a thickness and 3180 Lafarge, the blacktop contractor, let the paving machine run instead of the operators constantly making manual adjustments. At the end of the job, one of Birse's engineers looked at a 1km section of type 1 sub-base in detail. The average surface deviation on this tested carriageway was zero and local users of the A14 have even been phoning and emailing their approval of the smooth finish.

For more information on companies in this article

Related Content

  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • The side effect – paving with a road widener
    December 13, 2018
    Sidewinder UK has been using its novel road widener machines on a series of paving jobs, including smart motorway projects. Sidewinder UK has carried out work on the M6 smart motorway contract between junction 16 and junction 19. The company used one of its road wideners to place and grade the final layer of sub-base to the balanced central reservation in readiness for Tarmac Contracting to pave the base and binder courses. An estimated 5,000tonnes of sub-base was used in the initial 6.4km x 4.7m wide st
  • Bitumen trade bodies lead the carbon charge
    October 18, 2024
    On either side of the Atlantic, bitumen, asphalt and paving trade bodies are pushing their members to cut more carbon associated with their paving activities. Kristina Smith reports.