Skip to main content

GPS controlled graders deliver a smooth surface

Birse has used two machine control systems on the A14 project in the UK, one GPS-controlled to provide excavators with a +/-30mm accuracy and a second system which used a Trimble UTS as control on a grader to achieve +/- 5mm - well within the Highway Agency's sub-base tolerance of +10/-30mm. This meant that when it came to the asphalt surface, Birse agreed a thickness and Lafarge, the blacktop contractor, let the paving machine run instead of the operators constantly making manual adjustments. At the end of
July 12, 2012 Read time: 1 min
1486 Birse has used two machine control systems on the A14 project in the UK, one GPS-controlled to provide excavators with a +/-30mm accuracy and a second system which used a 2122 Trimble UTS as control on a grader to achieve +/- 5mm - well within the Highway Agency's sub-base tolerance of +10/-30mm. This meant that when it came to the asphalt surface, Birse agreed a thickness and 3180 Lafarge, the blacktop contractor, let the paving machine run instead of the operators constantly making manual adjustments. At the end of the job, one of Birse's engineers looked at a 1km section of type 1 sub-base in detail. The average surface deviation on this tested carriageway was zero and local users of the A14 have even been phoning and emailing their approval of the smooth finish.

For more information on companies in this article

Related Content

  • Road surface quality is vital to safety and policing - TISPOL 2015 conference
    January 18, 2016
    The state of Europe’s road surfaces “is absolutely vital” if TISPOL, the European Traffic Police Network, is going to achieve its target of halving road deaths across the continent by 2020 says AA president Edmund King Speaking at the 2015 TISPOL annual conference in Manchester, King warned that the deteriorating state of Europe’s road pavements has become “a serious problem” and that the number of potholes is now an important road safety issue for the enforcement community.
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the