Skip to main content

Efficient construction management with B2W

The firm is introducing an updated version of B2W Schedule with new capabilities for scheduling, dispatching and tracking construction materials. It is also offering significant field log user experience upgrades to B2W Track, the company’s field tracking and analysis software. In addition, the firm has a new B2W Inform app, which allows contractors to use the B2W forms and reporting solution without internet connectivity. B2W CEO and founder Paul McKeon said, “We completed important updates across our
July 3, 2019 Read time: 2 mins
B2W Software is now offering key product developments to its unified ONE Platform.


The firm is introducing an updated version of B2W Schedule with new capabilities for scheduling, dispatching and tracking construction materials. It is also offering significant field log user experience upgrades to B2W Track, the company’s field tracking and analysis software. In addition, the firm has a new B2W Inform app, which allows contractors to use the B2W forms and reporting solution without internet connectivity.

B2W CEO and founder Paul McKeon said, “We completed important updates across our estimating, field tracking and equipment maintenance elements and invested to keep the ONE Platform technologically current.”

The new materials management capabilities within B2W Schedule enable contractors to schedule and dispatch materials – in addition to employees, crews and equipment. They can also track quantities and locations of materials across their sites. B2W Schedule centralises resource planning, scheduling and dispatching processes and moves them online to allow real-time collaboration. Users across workflows can view and assign resources on desktop or mobile devices based on their areas of responsibility.

McKeon highlighted expanded browser compatibility and many time-saving user experience improvements to B2W Track, which drew positive reviews from attendees. “We’ve made it faster and easier to create and complete field logs and enhanced how B2W Track users can copy values from previous logs, catch potential errors and reconcile data from field logs with their accounting systems,” he added.

The new B2W Inform app benefits contractors that work in remote locations or other situations where they are unable to connect to the internet.

Electronic forms for safety, inspections, training and other use cases can be downloaded in advance to any mobile device, and the completed forms synch back with B2W Inform for distribution and reporting when a connection is established.

Cloud-based B2W Inform generates reports, dashboards and alerts from electronic forms.

Fast, easy creation and management of customised forms – including a user-ready template library -- enables contractors to replace paper-based processes and capture rich data in real time.

Related Content

  • Navman Wireless wins award
    April 30, 2012
    Navman Wireless’ Qtanium 300 GPS construction fleet tracking system has won a 2011 Chicago Innovation Award set up to recognise the most innovative new products and services introduced by Chicago-area companies. The Qtanium 300 is claimed to be the first universal construction fleet tracking system, making it possible to monitor actual equipment usage and associated costs for all makes and models of construction equipment from a single application. As part of the company's flagship OnlineAVL2 fleet tracking
  • Preparing a raceway with milling machinery
    November 6, 2018
    Contractor Continental Milling has played an important role in refurbishing the famous Pikes Peak Highway route in the US state of Colorado Working as a subcontractor for the Kiewit Corporation on the mill and overlay project, the Continental Milling crew was responsible for milling patches up to 213.4m long on the winding, two-lane highway known for its switchback turns and scenic vistas. The work was needed to prepare the route for the annual Pikes Peak International Hill Climb. Pikes Peak Highway fea
  • The paperless construction site
    August 9, 2019
    Digitalization is changing the construction industry faster than expected. Automation, additional sensors and the networking of machines make it possible to exploit optimization potential and noticeably increase productivity. However, despite innovative working methods and digitization, the road construction process is still mainly based on one medium: paper. Paper can be used for a wide variety of purposes and offers unlimited flexibility. Construction schedules, work schedules, work sheets, mix orders
  • Innovations in machine control deliver efficiency
    November 9, 2020
    How far has machine control technology come and what does the future hold?