Skip to main content

Denver Airport runway rebuild

Concrete paving equipment from GOMACO has been playing an important role in rebuilding the runway at Denver International Airport in Denver, Colorado, US. One of the first GOMACO GP-4000 pavers equipped with the latest G+ control system has been used to carry out resurfacing work on the Denver International Airport for Villalobos Concrete Company. The four-track GP-4000 machine has been used to slipform paving passes 7.6m wide and 457mm thick for the new runway surface. To ensure that the machine delivered
December 7, 2017 Read time: 1 min

Concrete paving equipment from 218 GOMACO has been playing an important role in rebuilding the runway at Denver International Airport in Denver, Colorado, US. One of the first GOMACO GP-4000 pavers equipped with the latest G+ control system has been used to carry out resurfacing work on the Denver International Airport for Villalobos Concrete Company. The four-track GP-4000 machine has been used to slipform paving passes 7.6m wide and 457mm thick for the new runway surface. To ensure that the machine delivered a quality surface it was equipped with the latest 3D guidance system from Leica Geosystems.

This was the first time that the contractor had utilised stringless paving technology but the firm was able to adapt to the new system and its many advantages.

For more information on companies in this article

Related Content

  • Efficient slipforming with Wirtgen
    May 15, 2019
    A Kentucky concrete slipforming contractor is benefiting from new technology in optimising kerb and gutter work. Fox Enterprises now constructs offset kerb, gutter and parking lot island placements using an on-site guidance system. The system permits automated placement of those items, including tight radii. Its fleet recently expanded to include a larger slipform paver that can handle offset curb-and-gutter paving, but also inset pavement slab paving.
  • Redevelopments at southern Polish airports
    August 21, 2013
    Rzeszów-Jasionka Airport in the south-east of Poland is now benefiting from a new taxiway constructed over a 50-month period and costing some €22.5 million. The work was required as the airport needs to increase capacity to cope with growing passenger traffic. The main portion of the project was for the construction of a 3km long taxiway, which lies parallel to the airport’s main runway. This taxiway now allows aircraft to manoeuvre away from the single runway and free up capacity for take-offs and land
  • Firm Grip: Liebherr, Leica and Steelwrist
    March 11, 2021
    The Leica Co-Pilot system controlling the Steelwrist X32 tiltrotator makes the job that little bit quicker and more accurate.
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.