Skip to main content

Denver Airport runway rebuild

Concrete paving equipment from GOMACO has been playing an important role in rebuilding the runway at Denver International Airport in Denver, Colorado, US. One of the first GOMACO GP-4000 pavers equipped with the latest G+ control system has been used to carry out resurfacing work on the Denver International Airport for Villalobos Concrete Company. The four-track GP-4000 machine has been used to slipform paving passes 7.6m wide and 457mm thick for the new runway surface. To ensure that the machine delivered
December 7, 2017 Read time: 1 min

Concrete paving equipment from 218 GOMACO has been playing an important role in rebuilding the runway at Denver International Airport in Denver, Colorado, US. One of the first GOMACO GP-4000 pavers equipped with the latest G+ control system has been used to carry out resurfacing work on the Denver International Airport for Villalobos Concrete Company. The four-track GP-4000 machine has been used to slipform paving passes 7.6m wide and 457mm thick for the new runway surface. To ensure that the machine delivered a quality surface it was equipped with the latest 3D guidance system from Leica Geosystems.

This was the first time that the contractor had utilised stringless paving technology but the firm was able to adapt to the new system and its many advantages.

For more information on companies in this article

Related Content

  • Power Curbers focuses on slipforming versatility
    January 6, 2017
    Power Curbers and its sister company Power Pavers exhibited the adaptable 5700-C and SF-1700 models at bauma, slipformers that have been both designed to provide the customer with a high degree of versatility.
  • Power Curbers focuses on slipforming versatility
    April 30, 2013
    Power Curbers and its sister company Power Pavers exhibited the adaptable 5700-C and SF-1700 models at bauma, slipformers that have been both designed to provide the customer with a high degree of versatility.
  • Helsinki Airport is benefiting from a new runway surface
    February 23, 2018
    Finland’s main international airport, serving the capital Helsinki, is now benefiting from a runway resurfacing project. The rehabilitation work has been needed for one of the airport’s three runways due to a number of age-related defects. Helsinki Airport processes some 17 million passengers/year and due to a combination of the often severe winter weather and the heavy aircraft traffic, the runway condition was not of the standard required. Resurfacing work was scheduled by FINAVIA, with a budget of some
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N