Skip to main content

Danish digging for Leica Geosystems’ 3D machine control

In Denmark’s northern Jutland, Leica Geosystems’ equipment is being used to help build a 40km motorway, one of the fastest-built such projects in the country’s history. The Danish Road Directorate is the client for the €5.4 million motorway between the two Danish cities of Herning, to the south with around 50,000 people, and Holstebro, a city of about 35,000 people, north of Herning. Preliminary ground investigations were made in 2013 and work started in 2015 with completion set for 2018.
October 26, 2017 Read time: 4 mins
Leica’s iCON gps 60 SmartAntenna is used for grade checking

In Denmark’s northern Jutland, 265 Leica Geosystems’ equipment is being used to help build a 40km motorway, one of the fastest-built such projects in the country’s history.

The 2284 Danish Road Directorate is the client for the €5.4 million motorway between the two Danish cities of Herning, to the south with around 50,000 people, and Holstebro, a city of about 35,000 people, north of Herning.

Preliminary ground investigations were made in 2013 and work started in 2015 with completion set for 2018. The motorway will connect the north-west of Jutland to a larger motorway network that accesses Denmark’s southern motorways and allows fast access to the rest of Europe.

Around 4 million m3 of soil has been excavated to form a cut through the landscape. It has given archaeologists a unique chance to explore the history of the ancient arterial road between Herning and Holstebro.

Leica Geosystems’ 3D machine control solutions are used for digging the search trenches to get a sideways and layered view of the deposits. This establishes if there are archaeological objects or material in the area and places them in chronological order.

Up to 600 people have been working on site. Leica Viva GS12 GNSS antenna together with the Leica CS15 controller automatically and precisely maps the findings. Archaeologists have on average made a finding for every 500m of digging. Objects have included a prehistoric sword dated around 600AD.

Glenn Lautrup is a foreman for MJ Eriksson Construction company that has the contract for 8km of the motorway near the village of Tvis. Products from Leica Geosystems are used on the entire project, both in the form of machine control solutions and products for grade checking and as-built documentation, explains Lautrup, who has worked on the project since August last year. On a typical day there are 10 dumpers, seven excavators, two bulldozers, one grader and three rollers as well as around 30 workers on the cut-through.

Up to 25% of the total budget for the motorway has been reserved for the preservation of nature. Around 650,000m³ of material has been excavated from nearby lakes for building the motorway. In the future, the lakes will be rehabilitated to create marshes and other lake areas. Several water channels and fauna passageways for hares, mice and frogs have been established. A 50m-wide fauna bridge - the largest of its kind in Denmark - has been built to allow red deer safe passage over the motorway.

Leica’s iCON gps 60 SmartAntenna is used for grade checking. Line Christensen is an engineer working with data preparation at MJ Eriksson’s office in Holstebro. Using Leica iCON office software, she prepares road models that are loaded into the machine control solutions. “I receive the 3282 AutoCad line file from the Danish Road Directorate,” she says.

“For this project, we are currently working on the 13th version of the file because there have been many changes to the project. I then use the Leica iCON office software to transform the AutoCad file to create triangulated files for the machine control solutions. Afterwards, I upload the file to Leica ConX, call the machine operator and tell him that there is a new updated file available.”

Line says that she visits the project daily to gain an understanding of what the operator needs in order for her to improve the preparation of files for them.

Heine Vendelbo is one of the MJ Eriksson operators who are in contact with Line. Vendelbo uses machine control systems on excavators, bulldozers and graders. He has been using machine control since 1985 and was one of the first people in Denmark to implement GNSS (Global Navigation Satellite System) in the heavy construction industry. On the current project Vendelbo uses his 233 Hitachi 320 excavator equipped with Leica iXE3 machine control for digging ditches, trenches and horizontal profiles.

“I’m 100% dependent on machine control in my daily work,” says Vendelbo. “Before the implementation of machine control, I would have a surveyor measure the area and place pegs and strings, all the while keeping a tight watch on my work. Now, I just load the file with the 3D model that I receive from Line Christensen into the machine control solution, and I can then do all the excavation alone just by following the model. If there are changes in the project, I simply delete the file and load the new version into the panel.”

For more information on companies in this article

Related Content

  • Mott MacDonald picks up Highways England’s operations centre deal
    March 28, 2018
    Mott MacDonald will set up an asset management system as part of Highways England’s new technology operations centre. Under the T-TOC contract - Tools for the Technology Operations Centre – Mott MacDonald will work with Fujitsu which will develop a suite of software systems to monitor and manage electronic assets across Highways England’s network. Highways England has nearly 100,000 intelligent infrastructure devices across England’s strategic road network – trunk roads and motorways. T-TOC will enable a
  • Soil improvement vs stabilisation: Wirtgen’s WR 250 in the US
    November 28, 2018
    Many invitations to tender continue to specify that the soil is to be exchanged. However, soil stabilisation is fast becoming a preferred option when it comes to ensuring the load-bearing capacity and quality of soil in preparation for road construction. The targeted addition of stabilising agents can help reduce the moisture content of soil, which is vital for roadworks. Compared to exchanging the entire soil, soil stabilisation is an economical and resource-saving method. Cost savings result from simpl
  • Concrete surface for runway paving job
    January 18, 2016
    The Fort Lauderdale-Hollywood International Airport in Broward County, Florida, was suffering departure delays on every single flight. The existing 9R-27L runway was too short at 1615m in length, affecting capacity at the airport. To deal with the issue, the Broward County Board of County Commissioners created a plan to extend the southern runway to 2438m to accommodate larger commercial aircraft. The project was not simple however and could not be achieved by tearing out the existing runway and buil
  • Accuracy from Sandvik’s WX6500 screening media
    April 13, 2018
    NCC Industry in Södra Sandby, Sweden has been using Sandvik’s latest screening media technology, the WX6500, for over a year The company reports that the first fine screening test panels are still in place and performing reliably. NCC Industry's Stone Materials division said that it has long chosen rubber screening media over wire mesh. The choice is crucial in Södra Sandby, where abrasive quartzite produces excessive wear on metal components. Yet despite its preference, the company said that it had stru