Skip to main content

Control package offerings

Trimble has established agreements with two more manufacturers of construction equipment with regard to machine control technology, Sumitomo and Yutong. Sumitomo is offering the Trimble Earthworks Grade Control Platform for Excavators as a factory-fit machine control solution for the Japanese market. The solution offers customers two options: 2D Machine Guidance or 2D Machine Control. Both packages can help boost the productivity and quality of earthmoving work. The 2D Machine Guidance option will include
December 15, 2017 Read time: 2 mins
Sumitomo’s earthmovers are now available with Trimble machine control tools from the factory

2122 Trimble has established agreements with two more manufacturers of construction equipment with regard to machine control technology, 2714 Sumitomo and Yutong. Sumitomo is offering the Trimble Earthworks Grade Control Platform for Excavators as a factory-fit machine control solution for the Japanese market. The solution offers customers two options: 2D Machine Guidance or 2D Machine Control. Both packages can help boost the productivity and quality of earthmoving work.

The 2D Machine Guidance option will include a Sumitomo-designed user interface, using the integrated machine display panel in the excavator cab. The 2D Machine Control factory fit option includes an 1223 Android tablet display running the Trimble Earthworks software application.

Zhengzhou Yutong Heavy Industries is the first Chinese manufacturer to offer the Trimble Ready package for dynamic compaction applications. The two firms have worked jointly to integrate the Trimble DPS900 Machine Control System onto Yutong’s dynamic compaction machines.

The DPS900 System uses real-time navigation and automatic recording and allows the operator to use a display to position the machine at the precise compaction point. The system automatically records the number of drops and the total displacement of each point. This new technology can improve productivity, avoid rework, and reduce the number of on-site construction workers needed, while boosting quality and safety.

For more information on companies in this article

Related Content

  • More satellites, more signals
    July 20, 2012
    Greater GPS accuracy suggests closer tolerances for surveying and machine control functions What happens in the future for GPS surveying and machine control could depend on satellite choice and signals. Right now there are around 30 satellites in orbit, largely built by the US, but by 2012 that could rise to 120 as Europe, China, India and Russia fully enter the market. A chequered history has faced the European's Galileo system. At long last, the finance appears to be in place and the European Commission a
  • New earthmoving machines
    July 29, 2019
    An array of advanced earthmoving machines are coming to market, offering increased performance, lower fuel consumption and reduced emissions The global market for earthmoving machines has been particularly strong over the last year. Demand for new equipment has been at a high, with sales of crawler excavators proving especially robust. Manufacturers have responded by increasing output, while tempting customers with new models offering major performance gains. Dozers In the market for dozers, Caterp
  • A competitive market
    August 2, 2012
    Competition is increasing in the earthmoving sectors, and for some companies market share is improving The wheeled loader market is becoming more competitive, with a number of firms now challenging the leading players, Caterpillar, Komatsu and Volvo. In other earthmoving product sectors such as excavators, companies such as Case, Doosan, Hyundai, JCB, Liebherr and Volvo are becoming more aggressive in terms of sales and are capturing market share. Case is gearing up its operations in Western Europe, Eastern
  • Machine control for Mexican graders
    November 29, 2012
    A major Mexican highway project has benefited from the use of the latest machine control technology from Trimble Contractor Construcarr estimates that its work on the Guadalajara – Colima highway project was finished 23% faster due to the use of machine control systems than it would have been using conventional technology. The company used a Trimble GCS900 grade control package instead of staking and grading methods. The company is a leader in road construction techniques in Mexico and has invested heavi