Skip to main content

Autodesk introduces new software tools

As World Highways was going to press Autodesk was due to announce the 2014 versions of its entire range of programs including AutoCAD, Civil 3D, NavisWorks and Revit Structural and others programs used by the road industry. As previously, they are packaged in suites; Standard, Premium and Ultimate. Key aspects focus around the inclusion of a completely new and fast point-cloud “engine” developed from the Alice Labs company acquisition made last year. Part of a new Autodesk Recap, standing for reality captur
April 25, 2013 Read time: 2 mins
As 3260 World Highways was going to press 685 Autodesk was due to announce the 2014 versions of its entire range of programs including AutoCAD, Civil 3D, NavisWorks and Revit Structural and others programs used by the road industry. As previously, they are packaged in suites; Standard, Premium and Ultimate.

Key aspects focus around the inclusion of a completely new and fast point-cloud “engine” developed from the Alice Labs company acquisition made last year. Part of a new Autodesk Recap, standing for reality capture, this will be able to open point-clouds in the main tools used in civil engineering such as Map, Civil 3D and Revit. Recap is included in all of them. The company says the new engine is fast, inputs most of the major formats, and can translate point-clouds into different local coordinate systems to match other data.

The Infrastructure Modeller tool, for conceptualising projects and testing sketch scenarios is now relaunched as a enhanced version, re-named InfraWorks.

In the Ultimate suite this will include roads and highway modules which allow early design sketches to be done with precision data, so that they can be imported directly into Civil 3D for further work. It will also link to the cloud for tasks like optimisation of the vertical alignment

– part of a general philosophy for all Autodesk products using more "infinite" computing power of the cloud for heavy "grunt" work, instead of the local desktop.  Rendering capacity is another aspect.

The cloud will also be used for communication, and design and construction collaboration, with BIM360 Glue, a cloud accessed tool for design integration and class detection, which is a “NavisWorks light" - accessed via a very small client application with full high quality graphics whatever the capacities of the local laptop.

For more information on companies in this article

Related Content

  • Tampa picks one.network for management
    April 20, 2023
    The Tampa Hillsborough Expressway Authority (THEA) in the US state of Florida is boosting its traffic management, work zone notification and construction planning process.
  • Engine/component efficiencies are top bill
    May 25, 2016
    Driveline specialist Dana is developing a full connectivity suite for its transmissions, axles and other driveline components. The Dana Spicer Smart Suite collects, manages, analyses, communicates and acts on data from the complete drivetrain, including load and condition monitoring, torque management, speed sensing and steering sensing. This provides critical alerts and allows the operator to react to operational changes, boosting productivity and safety. “As the construction market becomes more comp
  • Rural roads important to global development
    April 12, 2012
    Maryvonne Plessis-Fraissard highlights that the key importance of rural roads in the context of global development is only now being fully recognised, is not receiving enough attention and is facing vital new challenges Rural roads have only relatively recently received attention in development research. The International Bank for Reconstruction and Development, or World Bank, moved away from the World War II reconstruction mandate during the early 1960s to start, and address, the "Third World" developme
  • Smart road surfacing in a tunnel
    August 19, 2022
    Smart road construction techniques have been used in the widest tunnel in Switzerland. Efficient operation and logistics were required for paving a width of 11.5m in the Gubrist Tunnel and contractor Marti AG Solothurn Bauunternehmung made good use of Vögele’s WITOS Paving Plus technology to optimise its work on the project.