Skip to main content

Autodesk introduces new BIM training tool

Autodesk has launched a specialist training and certification package for civil engineers to bring them up to speed on modem BIM (information modelling) workflows. The Autodesk Official Training Guide, is not just teaching the functionality of the programs says the company, but aims to show how the Autodesk infrastructure software workflows "can help owners and service providers on roads and highways improve productivity, optimise designs, and accelerate project approvals." The course simulates a roadways p
August 22, 2013 Read time: 1 min
685 Autodesk has launched a specialist training and certification package for civil engineers to bring them up to speed on modem BIM (information modelling) workflows. The Autodesk Official Training Guide, is not just teaching the functionality of the programs says the company, but aims to show how the Autodesk infrastructure software workflows "can help owners and service providers on roads and highways improve productivity, optimise designs, and accelerate project approvals." The course simulates a roadways project from planning and design through visual communication and construction documentation using an integrated BIM workflow using the latest 3282 AutoCAD Civil 3D, Autodesk InfraWorks, Autodesk InfraWorks 360, and Autodesk Navisworks Manage software. The Autodesk Infrastructure Design Suite 2014: BIM Workflow for Roads and Highways guide is available in hard copy or eBook format by online purchase from Ascent publishing (%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.ASCENTed.com www.ASCENTed.com false http://www.ascented.com/ false false%>).

For more information on companies in this article

Related Content

  • Alpha 330 drilling tool system from Sandvik
    February 13, 2013
    Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling. It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible. The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and imp
  • Dana Rexroth will launch the high-efficiency R2 hydromechanical variable transmission for smaller machines
    January 6, 2017
    Dana Rexroth Transmission Systems, the joint venture Dana and Bosch Rexroth, is to launch the R2 hydromechanical variable transmission (HVT). The modular transmission uses both a hydrostatic drive and a mechanical gearbox to deliver fuel savings of up to 25% compared to a torque converter transmission. Designed to work with engine outputs of 134-193kW (180-260hp), the R2 is suitable for use in wheeled loaders, motor graders, lift trucks and a variety of off-highway applications. The hydrostatic drive unit
  • Dana Rexroth will launch the high-efficiency R2 hydromechanical variable transmission for smaller machines
    February 7, 2013
    Dana Rexroth Transmission Systems, the joint venture Dana and Bosch Rexroth, is to launch the R2 hydromechanical variable transmission (HVT). The modular transmission uses both a hydrostatic drive and a mechanical gearbox to deliver fuel savings of up to 25% compared to a torque converter transmission. Designed to work with engine outputs of 134-193kW (180-260hp), the R2 is suitable for use in wheeled loaders, motor graders, lift trucks and a variety of off-highway applications. The hydrostatic drive unit
  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe