Skip to main content

Accurate grading for Africa

Two Caterpillar 14M graders equipped with AccuGrade dual GPS systems with cross-slope capability are providing accurate finish for road construction and upgrading work on projects in the Republic of Burundi.
February 13, 2012 Read time: 2 mins
Linked with AccuGrade GPS machine control, Caterpillar's 14M is allowing the contractor to grade more.day compared to previous methods
Two 178 Caterpillar 14M graders equipped with AccuGrade dual GPS systems with cross-slope capability are providing accurate finish for road construction and upgrading work on projects in the Republic of Burundi. The machines form part of an extensive fleet of Cat equipment that includes seven track-type tractors, five excavators, two wheeled loaders and six graders. The machines are owned by contractor 1286 Sogea satom and were supplied by dealer 1287 Tractafric and are working with an AccuGrade-ready D7R II already on site. The three machines are increasing accuracy and productivity on the road project by sharing the AccuGrade machine control systems.

These two are the first AccuGrade systems being used by the contractor to replace traditional surveying and staking methods on its earthmoving projects. And the system is being thoroughly trialled on three road projects in Burundi that are valued at €70m. These include the 35km RN14 Kirundo-Gaseyni trunk road, the 104km RN12 Gitega-Muyinga trunk road and 31km of road and pavement refurbishment in capital, Bujumbura. It is reckoned that Sogea-Satom will implement this new technology in its processes in Africa, to improve machine performance and productivity on the three road building projects.

The longest section of road is the RN12 which runs through a mountainous region some 1500-1600m above sea level. Despite being heavily shadowed by trees and vegetation that could in some areas mask satellite signals, the contractor says that the AccuGrade equipment is proving accurate and reliable.

The first use for AccuGrade was with the D7R, removing 300mm of poor material to allow foundation and road base materials to be installed. Using the D7R with AccuGrade, 100 metres of road were completed in 30 minutes, vastly improving productivity. With the 14M motor graders, the quality of work has also been improved too, compared to relying on stakes every 25m.

For more information on companies in this article

Related Content

  • Asphalt milling and paving with 3D control
    February 16, 2012
    Milling and paving repair operations for airport runways require particularly high tolerances, an obvious market for 3D control solutions writes Mike Woof. Airport runways require some of the most accurate quality standards and tightest tolerances of any asphalt or concrete surface. This is one area where the high precision capabilities of 3D systems offer clear advantages.
  • Demanding earthworks on major highway scheme
    February 24, 2012
    Portuguese contractor Mota-Engil Group has been awarded the construction of a 270km Douro Interior Highways project in the north-east of Portugal, one of the longest highway projects ever awarded in the country.
  • New racetrack benefits from new technology
    December 3, 2014
    The use of new technology has helped pave the way for a new US racetrack Saving construction costs and meeting tight tolerances, sophisticated technology has helped deliver a quality racetrack surface within tight time constraints. The National Corvette Museum (NCM) in Bowling Green, Kentucky, lies close to Interstate 65 and now features a brand new racetrack, constructed with the assistance of the latest machine control technologies.
  • Machine control used for road revamp for Arkansas highway
    June 23, 2015
    A historic route in the US state of Arkansas has benefited from the use of machine control during its upgrade The south-west - north-east US Route 67 in Arkansas has long been a significant transport route. This old road follows the natural break between the Ozark Mountains and the Ouachita Mountains. In the 1920s, funding became available for road paving, and the route was designated US Route 67.