Skip to main content

Accurate grading for Africa

Two Caterpillar 14M graders equipped with AccuGrade dual GPS systems with cross-slope capability are providing accurate finish for road construction and upgrading work on projects in the Republic of Burundi.
February 13, 2012 Read time: 2 mins
Linked with AccuGrade GPS machine control, Caterpillar's 14M is allowing the contractor to grade more.day compared to previous methods
Two 178 Caterpillar 14M graders equipped with AccuGrade dual GPS systems with cross-slope capability are providing accurate finish for road construction and upgrading work on projects in the Republic of Burundi. The machines form part of an extensive fleet of Cat equipment that includes seven track-type tractors, five excavators, two wheeled loaders and six graders. The machines are owned by contractor 1286 Sogea satom and were supplied by dealer 1287 Tractafric and are working with an AccuGrade-ready D7R II already on site. The three machines are increasing accuracy and productivity on the road project by sharing the AccuGrade machine control systems.

These two are the first AccuGrade systems being used by the contractor to replace traditional surveying and staking methods on its earthmoving projects. And the system is being thoroughly trialled on three road projects in Burundi that are valued at €70m. These include the 35km RN14 Kirundo-Gaseyni trunk road, the 104km RN12 Gitega-Muyinga trunk road and 31km of road and pavement refurbishment in capital, Bujumbura. It is reckoned that Sogea-Satom will implement this new technology in its processes in Africa, to improve machine performance and productivity on the three road building projects.

The longest section of road is the RN12 which runs through a mountainous region some 1500-1600m above sea level. Despite being heavily shadowed by trees and vegetation that could in some areas mask satellite signals, the contractor says that the AccuGrade equipment is proving accurate and reliable.

The first use for AccuGrade was with the D7R, removing 300mm of poor material to allow foundation and road base materials to be installed. Using the D7R with AccuGrade, 100 metres of road were completed in 30 minutes, vastly improving productivity. With the 14M motor graders, the quality of work has also been improved too, compared to relying on stakes every 25m.

For more information on companies in this article

Related Content

  • Machine control innovations
    February 15, 2012
    THE RECENT CONEXPO-CON/AGG exhibition has seen the launch of a wealth of new machine control technologies - Mike Woof reports A fast pace of technological development in the machine control sector is seeing new innovations come to market at regular intervals. The developments remain focussed on the three main technology suppliers to this market, Leica Geosystems, Topcon and Trimble, offereng a combination of systems using machine control based on GPS, total station, sonic units and industrial inertial gu
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports