Skip to main content

VIDEO: Cycle parking at the office is getting easier

Highway designers are increasingly asked to integrate cycle lanes and paths into their projects in major urban areas. And many commuting cyclists are grateful for it, too. But what happens when the cycle path ends, even if it is right outside the rider’s destination, such as his or her work place, be it an office building or factory? That last few metres are essential for completing the perfect commute. This means being able to park the bicycle in a secure environment.
September 7, 2015 Read time: 2 mins
Highway designers are increasingly asked to integrate cycle lanes and paths into their projects in major urban areas.

And many commuting cyclists are grateful for it, too.

But what happens when the cycle path ends, even if it is right outside the rider’s destination, such as his or her work place, be it an office building or factory?

That last few metres are essential for completing the perfect commute. This means being able to park the bicycle in a secure environment.

Over the past decade or so, more and more businesses have been designing cycle parking on the premises, as well as installing shower and change-room facilities – even drying areas for a cyclists rain-soaked clothes.

But it’s been a struggle allowing cyclist to bring their two-wheels into the office if that is the only place to keep it safe. In some cities, such as New York, it’s mandatory for business’s and property owners to allow this.

New York City’s Bikes in Buildings programme is to aid the Bicycle Access to Office Buildings Law that aims to increase bicycle commuting by providing cyclists secure parking their bicycles in or close to their workplaces. The programme allows tenants of office buildings to request bicycle access for their employees. In response to a request, a building owner or manager must either grant access or request an exception from the New York City Department of Transportation.

The law, however, applies only to commercial office buildings with at least one freight elevator. It does not apply to residential buildings or any other building that is not primarily composed of offices.

There could also be a downside to encouraging cycle commuting. Some people just don’t know when to leave their bicycle outside, as the video below shows.

In London, one property owner has gone one wheel-turn further by designing in a cycle ramp right into the office, as this %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal BBC video Visit BBC Website false http://www.bbc.co.uk/news/business-34154520 false false%> shows. However, the cycle ramp at the refurbished Alphabeta building it may not be a ride for the faint-hearted.

Related Content

  • Unitruck’s money saving mirrors
    April 13, 2012
    Unitruck’s says its new range of mirrors and arms specifically for plant machinery being showcased at INTERMAT 2012 will be available through Europe’s leading Agricultural and Plant Spare Parts Dealers from this month. Owners of trucks across Europe are already said by the UK firm to be saving millions of Euros each year by fitting Unitruck’s existing range of replacement mirrors.
  • A sophisticated data communications system is offered by Trimble
    January 6, 2017
    Trimble says that its combined device for mobile communications and surveying data collection offers high performance and reliability. Called the Trimble Slate Controller, this rugged new unit is said to combine the convenience and ease-of-use of a smartphone with durability. Optimised for use with the Trimble Access field software and the Trimble R4 GNSS receiver, the Trimble Slate Controller supports a surveyor’s workflows. Offering voice, SMS text, and 3.75G cellular data transfer capabilities on GSM cel
  • A sophisticated data communications system is offered by Trimble
    March 8, 2013
    Trimble says that its combined device for mobile communications and surveying data collection offers high performance and reliability. Called the Trimble Slate Controller, this rugged new unit is said to combine the convenience and ease-of-use of a smartphone with durability. Optimised for use with the Trimble Access field software and the Trimble R4 GNSS receiver, the Trimble Slate Controller supports a surveyor’s workflows. Offering voice, SMS text, and 3.75G cellular data transfer capabilities on GSM cel
  • Haulotte sales up 13%
    January 6, 2017
    Haulotte Group (HG) increased its Q4 2011 sales by 13%, compared to the same period of 2010. The rise took consolidated October 1 to December 31 2011 sales to US$107.1million (€82.2 million) compared with $94.5million (€72.5million) in the same three months of last year.