Skip to main content

VIDEO: Cycle parking at the office is getting easier

Highway designers are increasingly asked to integrate cycle lanes and paths into their projects in major urban areas. And many commuting cyclists are grateful for it, too. But what happens when the cycle path ends, even if it is right outside the rider’s destination, such as his or her work place, be it an office building or factory? That last few metres are essential for completing the perfect commute. This means being able to park the bicycle in a secure environment.
September 7, 2015 Read time: 2 mins
Highway designers are increasingly asked to integrate cycle lanes and paths into their projects in major urban areas.

And many commuting cyclists are grateful for it, too.

But what happens when the cycle path ends, even if it is right outside the rider’s destination, such as his or her work place, be it an office building or factory?

That last few metres are essential for completing the perfect commute. This means being able to park the bicycle in a secure environment.

Over the past decade or so, more and more businesses have been designing cycle parking on the premises, as well as installing shower and change-room facilities – even drying areas for a cyclists rain-soaked clothes.

But it’s been a struggle allowing cyclist to bring their two-wheels into the office if that is the only place to keep it safe. In some cities, such as New York, it’s mandatory for business’s and property owners to allow this.

New York City’s Bikes in Buildings programme is to aid the Bicycle Access to Office Buildings Law that aims to increase bicycle commuting by providing cyclists secure parking their bicycles in or close to their workplaces. The programme allows tenants of office buildings to request bicycle access for their employees. In response to a request, a building owner or manager must either grant access or request an exception from the New York City Department of Transportation.

The law, however, applies only to commercial office buildings with at least one freight elevator. It does not apply to residential buildings or any other building that is not primarily composed of offices.

There could also be a downside to encouraging cycle commuting. Some people just don’t know when to leave their bicycle outside, as the video below shows.

In London, one property owner has gone one wheel-turn further by designing in a cycle ramp right into the office, as this %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal BBC video Visit BBC Website false http://www.bbc.co.uk/news/business-34154520 false false%> shows. However, the cycle ramp at the refurbished Alphabeta building it may not be a ride for the faint-hearted.

Related Content

  • Tecnoidea Impianti plants reputation worldwide
    April 9, 2013
    With over 3,600,000m³ of water purified daily in more than 3,000 of its plants all over the world, Tecnoidea Impianti is one of the leading companies worldwide for water purification plants and sludge treatment systems. Its closed-cycle plants are aimed at marble and granites, aggregates and soil washing, tunnelling and concrete areas.
  • JCB engine uses ‘mini-SCR’ to meet Tier 4 Final
    January 6, 2017
    JCB says its Ecomax Stage 4/Tier 4 Final engine can be engineered into many existing machines without needing additional space by using a ‘one can’ selective catalytic reduction (SCR). According to the company’s chief technology officer, Tim Burnhope, in many cases the mini SCR on the Stage 4/Tier 4 Final Ecomax engine can be positioned in the same space occupied by the exhaust silencer on previous generations. He said, “Our engine is already so clean that we only need 2% to 3% of urea, which allows us to u
  • JCB engine uses ‘mini-SCR’ to meet Tier 4 Final
    April 15, 2013
    JCB says its Ecomax Stage 4/Tier 4 Final engine can be engineered into many existing machines without needing additional space by using a ‘one can’ selective catalytic reduction (SCR). According to the company’s chief technology officer, Tim Burnhope, in many cases the mini SCR on the Stage 4/Tier 4 Final Ecomax engine can be positioned in the same space occupied by the exhaust silencer on previous generations. He said, “Our engine is already so clean that we only need 2% to 3% of urea, which allows us to u
  • Liebherr 150EC-B is latest flat-top crane
    February 7, 2013
    Liebherr will show a modular design flat-top tower crane in the 150EC-B at this year’s Bauma. The 150EC-B is available in FR.tronic, with traditional contractor controls, or Litronic version with programmable logic controls. The flat-top crane can be had in 6 tonne and 8 tonne versions, with a maximum hook height of 63m and maximum working radius of 60m. Lift capacity at full radius is 1,700kg.