Skip to main content

Underground UK asset searches jump 18%, according to LSBUD

The number of asset underground searches for UK highways projects rose 18% on the year before, according to a data collection and search provider.
September 18, 2019 Read time: 2 mins
Do the spadework before going underground, urges asset search solutions provider LSBUD (Linesearch BeforeUdig)

Of the searches, 360,000 searches for highways projects, 38% were for the installation of street furniture, 18% related to road resurfacing, 13% were for linear projects, 3% for gully works and 1% for traffic calming measures.

Despite the promising increases in the number of searches, more than 1.5 million projects out of an estimated 4 million total – including those on highways – still took place without completing a detailed search for underground assets. This equates to 38%, or a dig every 21 seconds, according to the report Digging up Britain 2019, by LSBUD - Linesearch BeforeUdig.

Richard Broome, managing director of LSBUD, welcomed the increases in searches for any pipes or cables before contractors put a spade or digger in the ground. “However, it is worrying that nearly four in ten projects are still being completed without a proper search.

“Worker and public safety are obviously the primary concerns when an asset is hit. But beyond this the direct and the hidden costs can quickly escalate and that’s not to mention the damage to the contractor’s reputation. That’s why we urge those involved in highway projects to always conduct a search,” he said.

LSBUD’s report explores the costs of asset strikes, sharing data from a study by the University of Birmingham. Factoring in indirect costs such as worker ill-health or injuries caused by a strike plus traffic disruption, impact on the immediate neighbourhood and loss of custom to local business, the true cost of an asset strike is 29 times the direct cost. This equates for every €1,130 of direct cost arising from a utility strike the true cost is €32,755, according to the report.

The risk of such expensive asset strikes is being exacerbated by the growing volume of emergency work taking place. Emergency enquiries increased by 88% last year. If these figures are indicative of what’s happening nationally, of the 4 million jobs completed, 216,000 were emergency related.
 
“This spike in emergency projects is worrying,” said Broome. “If an asset isn’t registered with our portal, the firm doing the digging will need to deal with the asset owner directly and that can take up to 28 days. This time scale does not fit with the idea of an ‘emergency’, so corners may be cut and assets struck due to the need for speed.”

According to the report, of the UK’s 1.5 million kilometres of underground utility infrastructure, about 800,000km is covered by LSBUD’s collaborative portal. This is a 23% increase on last year.

Related Content

  • The US FAST Act: a job left unfinished
    April 4, 2016
    US roads and bridges are crumbling at an alarming rate as state governments wring their hands over the increasingly scarce money for repairs. Enter the FAST Act. But is it enough? US state transportation department officials, as well as highway contractors and operators, breathed a sigh of relief in December. For months the highways infrastructure sector waited anxiously to see where the necessary money for road projects would come from. For several years, the Highways Trust Fund – the usual way of paying f
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • “Bold and brave” rallying call to cash-starved UK highway maintenance teams
    July 24, 2012
    UK local authorities and other organisations must be “bold and brave” in their structuring of repair and maintenance works, delegates at a key road engineering conference in Birmingham, central England were told. Speaking at the Developments in Pavement Assessment (DIPA 2012) event Les Hawker, highways manager at Transport for London (TfL), said: “There is no extra money and only 20% of the [Government budget] cuts have taken place so far. Over the next five years the other 80% of cuts will come through. Or
  • Road pricing could boost UK road investment
    July 4, 2012
    UK road users receive a mere £4 billion in capital investment, and congestion increases. Road pricing could provide the roads needed and reduce taxes, says a new report UK motorists receive a "paltry" £4 billion (€5 billion) investment in road capacity in return for the €57.5 billion a year they contribute in road user taxes, according to the 2008/9 Road File, published by the UK Road Users Alliance (RUA). Over the last decade, this infrastructure spend has led to a minimal 1% increase in the road network t