Skip to main content

Underground UK asset searches jump 18%, according to LSBUD

The number of asset underground searches for UK highways projects rose 18% on the year before, according to a data collection and search provider.
September 18, 2019 Read time: 2 mins
Do the spadework before going underground, urges asset search solutions provider LSBUD (Linesearch BeforeUdig)

Of the searches, 360,000 searches for highways projects, 38% were for the installation of street furniture, 18% related to road resurfacing, 13% were for linear projects, 3% for gully works and 1% for traffic calming measures.

Despite the promising increases in the number of searches, more than 1.5 million projects out of an estimated 4 million total – including those on highways – still took place without completing a detailed search for underground assets. This equates to 38%, or a dig every 21 seconds, according to the report Digging up Britain 2019, by LSBUD - Linesearch BeforeUdig.

Richard Broome, managing director of LSBUD, welcomed the increases in searches for any pipes or cables before contractors put a spade or digger in the ground. “However, it is worrying that nearly four in ten projects are still being completed without a proper search.

“Worker and public safety are obviously the primary concerns when an asset is hit. But beyond this the direct and the hidden costs can quickly escalate and that’s not to mention the damage to the contractor’s reputation. That’s why we urge those involved in highway projects to always conduct a search,” he said.

LSBUD’s report explores the costs of asset strikes, sharing data from a study by the University of Birmingham. Factoring in indirect costs such as worker ill-health or injuries caused by a strike plus traffic disruption, impact on the immediate neighbourhood and loss of custom to local business, the true cost of an asset strike is 29 times the direct cost. This equates for every €1,130 of direct cost arising from a utility strike the true cost is €32,755, according to the report.

The risk of such expensive asset strikes is being exacerbated by the growing volume of emergency work taking place. Emergency enquiries increased by 88% last year. If these figures are indicative of what’s happening nationally, of the 4 million jobs completed, 216,000 were emergency related.
 
“This spike in emergency projects is worrying,” said Broome. “If an asset isn’t registered with our portal, the firm doing the digging will need to deal with the asset owner directly and that can take up to 28 days. This time scale does not fit with the idea of an ‘emergency’, so corners may be cut and assets struck due to the need for speed.”

According to the report, of the UK’s 1.5 million kilometres of underground utility infrastructure, about 800,000km is covered by LSBUD’s collaborative portal. This is a 23% increase on last year.

Related Content

  • Efficient asset management to trim maintenance budgets
    January 22, 2014
    Transport infrastructure is taken for granted in many, if not most, developed countries. This has resulted in a shortage of investment in maintenance, posing potential long term cost issues. In many developing nations transport networks are expanding fast, but insufficient thought is also being given to how these will be maintained.
  • Smarter road crossings with the Smart Crossing from Umberllium
    November 15, 2017
    Urban design technologists Umbrellium said that it has created the Smart Crossing, a pedestrian crossing that adjusts its lines and colours according to the situation. The crossing, a prototype, was developed for UK insurance company Direct Line in response to research which highlighted the dangers for people, cyclists and vehicle drivers at pedestrian crossings. Research by Road Safety Analysis, a designer of highway safety programmes and services, noted that there were more than 29,000 casualties on or n
  • Simple road safety measures save lives
    February 15, 2012
    Elementary road safety measures quickly pay back the costs of investment and, more importantly, help save lives as Patrick Smith reports. More than 300 people in the UK are alive today or have avoided the prospect of a lifetime of special care because just 15 roads have had simple improvements put in place.
  • Hire Association Europe steals a march
    August 28, 2024
    The association’s new web portal will share equipment theft information with the UK’s National Construction & Agricultural Theft Team (NCATT) and the Construction and Agricultural Equipment Security & Registration Scheme (CESAR).