Skip to main content

Trimble wins Beijing Airport deal

Trimble has won a major contract in China, which forms part of the airport capacity expansion for Beijing. The new Beijing airport facility is expected to handle up to 72 million travellers, 2 million tonnes of freight and 620,000 flights by 2025. This is a massive construction project requiring a huge investment in civil aviation by the Chinese Government. In order to construct the airport efficiently, safely and within a strict timeframe while achieving optimum quality, the Beijing New Airport Project is
December 10, 2015 Read time: 2 mins
2122 Trimble has won a major contract in China, which forms part of the airport capacity expansion for Beijing. The new Beijing airport facility is expected to handle up to 72 million travellers, 2 million tonnes of freight and 620,000 flights by 2025. This is a massive construction project requiring a huge investment in civil aviation by the Chinese Government. In order to construct the airport efficiently, safely and within a strict timeframe while achieving optimum quality, the Beijing New Airport Project is using innovative technology from Trimble to integrate construction and operations.

Trimble was chosen by the Beijing New Airport Project to implement a browser-based, locally-hosted digital construction information management system for tracking and monitoring construction operations in real-time. The Trimble solution allows users to create 3D constructible models, perform soil stabilisation, automate construction processes and effectively manage information. Based on the successful soil stabilisation results using Trimble machine control over the past four months, another 15 systems have been ordered.

“The research results for dynamic compaction have been extremely promising,” said Li Qiang, chief engineer of the Beijing New Airport Construction Office. “As a result, the project is pushing forward with a larger scale deployment to further the research into creating new methods and standards for airfield construction.”

“The Beijing New Airport Project is a significant win for Trimble and we are very excited about the success of the project,” said Steve Berglund, president and CEO of Trimble. “The contract extension validates Trimble’s ability to provide innovative solutions that transform work processes by maximising management capability, ensuring construction quality and improving productivity.”

For more information on companies in this article

Related Content

  • Trimble’s new technology helps optimise operations
    March 8, 2014
    Trimble is offering the integration of LOADRITE X2350 excavator scales and L2180 wheel loader scales with its latest management software. LOADRITE weighing systems help increase productivity and efficiency for excavator and wheel loader operations, allowing material movements to be tracked and creating more efficient loading.
  • The next generation of the WR series delivers higher mixing performance and quality
    June 2, 2025
    At bauma, Wirtgen presented the latest generation of the WR series, developed by the company especially for cold recycling and stabilisation applications. The machines impress with an optimised operating concept and consistently high productivity and mixing quality. With the new operator’s cabin and a revised and improved operating concept, the WR series machines enable the achievement of particularly efficient and cost-effective workflows.
  • Solari gives Doha airport baggage truck drivers the VMS signal
    March 6, 2015
    VMS innovations offer transportation efficiency gains – David Arminas writes. Baggage truck drivers at the new Hamad International Airport in Doha, Qatar, are now getting real-time imformation and directions on variable message signage. The airport opened last April and will be the first touchdown point for fans attending the football World Cup in Qatar in 2022. The airport is only 4km away from the overused but now redundant Doha International Airport, which will be demolished and redeveloped as an urban p
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w