Skip to main content

Trimble wins Beijing Airport deal

Trimble has won a major contract in China, which forms part of the airport capacity expansion for Beijing. The new Beijing airport facility is expected to handle up to 72 million travellers, 2 million tonnes of freight and 620,000 flights by 2025. This is a massive construction project requiring a huge investment in civil aviation by the Chinese Government. In order to construct the airport efficiently, safely and within a strict timeframe while achieving optimum quality, the Beijing New Airport Project is
December 10, 2015 Read time: 2 mins
2122 Trimble has won a major contract in China, which forms part of the airport capacity expansion for Beijing. The new Beijing airport facility is expected to handle up to 72 million travellers, 2 million tonnes of freight and 620,000 flights by 2025. This is a massive construction project requiring a huge investment in civil aviation by the Chinese Government. In order to construct the airport efficiently, safely and within a strict timeframe while achieving optimum quality, the Beijing New Airport Project is using innovative technology from Trimble to integrate construction and operations.

Trimble was chosen by the Beijing New Airport Project to implement a browser-based, locally-hosted digital construction information management system for tracking and monitoring construction operations in real-time. The Trimble solution allows users to create 3D constructible models, perform soil stabilisation, automate construction processes and effectively manage information. Based on the successful soil stabilisation results using Trimble machine control over the past four months, another 15 systems have been ordered.

“The research results for dynamic compaction have been extremely promising,” said Li Qiang, chief engineer of the Beijing New Airport Construction Office. “As a result, the project is pushing forward with a larger scale deployment to further the research into creating new methods and standards for airfield construction.”

“The Beijing New Airport Project is a significant win for Trimble and we are very excited about the success of the project,” said Steve Berglund, president and CEO of Trimble. “The contract extension validates Trimble’s ability to provide innovative solutions that transform work processes by maximising management capability, ensuring construction quality and improving productivity.”

For more information on companies in this article

Related Content

  • Data handling for efficient machine control
    October 16, 2012
    The rapid increase in information availability is transforming the construction sector. Conventional methods used for sourcing geographic data based on maps and localised sampling meant that there was often a lack of accurate information relating to ground conditions at specific areas where work was planned, often resulting in unwelcome surprises for construction companies along with additional costs for projects.
  • Latest innovations in GPS and machine control
    February 22, 2012
    Modern satellite technology is making life easier for everyone on the construction site and in the office. Most major equipment manufacturers are now integrating GPS machine control systems into the design of excavators, bulldozers, pavers, and motor graders. For stake-less work it is a major component for automatic grading, surveying, and excavating systems, with contractors and construction companies using GPS machine control systems to improve operations.
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Muscat Airport contract for Cooper
    February 9, 2012
    A huge project in Oman will see a proposed new terminal at Muscat International Airport, which has been budgeted at US$1.17 billion, completed by 2014. It will have the capacity to handle 12 million passengers annually, and further expansions planned by The Ministry of Transport and Communication in three subsequent phases will ultimately boost the airport’s capacity to 48 million passengers annually by 2050.