Skip to main content

Transoft expands with Simtra acquisition

Software specialist Transoft Solutions is completing its acquisition of Simtra AeroTech. The deal is of significance and Transoft Solutions is a major player in the market for transportation engineering design solutions. Meanwhile Simtra AeroTech is a leading supplier of software for airport and road designers. Both companies are pioneers in the transportation industry with CAD based software solutions such as AutoTURN and AeroTURN (Transoft Solutions) and PathPlanner (Simtra). Located in Gothenburg, Sweden
January 29, 2014 Read time: 1 min
Software specialist 349 Transoft Solutions is completing its acquisition of Simtra AeroTech. The deal is of significance and Transoft Solutions is a major player in the market for transportation engineering design solutions. Meanwhile Simtra AeroTech is a leading supplier of software for airport and road designers. Both companies are pioneers in the transportation industry with CAD based software solutions such as AutoTURN and AeroTURN (Transoft Solutions) and PathPlanner (Simtra). Located in Gothenburg, Sweden, Simtra has an international client list of transportation and aviation consultants, engineers and airport planners. Both Transoft and Simtra have a long-history of R&D and the deal strengthens the drive to provide solutions that allow its customers to design with the utmost confidence.

For more information on companies in this article

Related Content

  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • Sandvik supporting aggregate production in Panama
    February 20, 2014
    Located 40km north of Panama City, Panama Development of Infrastructure (PDI) is assisting the Petaquilla Gold Mine, part of Petaquilla Minerals, in producing high quality aggregates from excavated materials at the mine. In order to support the activities of Petaquilla Minerals, the only mining company currently operating in Panama, PDI is using a selection of Sandvik drilling, crushing and screening equipment, all manufactured by, which has been supplied, and is supported by, Sandvik’s distributor in Pana
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N
  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la