Skip to main content

Study for new UK tunnel proposal

Engineering specialists Mouchel and Hyder team are now working jointly on a feasibility study worth €1.87 million (£1.3 million). The contract is to investigate the feasibility of the proposed Trans-Pennine tunnel. This link would connect the cities of Manchester and Sheffield. The cost of the road tunnel running is expected to be high but a new route is needed as the existing connections are nearing capacity and from an environmental perspective, taking the traffic underground would be preferential. This s
July 27, 2015 Read time: 1 min
Engineering specialists 2377 Mouchel and Hyder team are now working jointly on a feasibility study worth €1.87 million (£1.3 million). The contract is to investigate the feasibility of the proposed Trans-Pennine tunnel. This link would connect the cities of Manchester and Sheffield. The cost of the road tunnel running is expected to be high but a new route is needed as the existing connections are nearing capacity and from an environmental perspective, taking the traffic underground would be preferential. This study is one of several that has been commissioned by the UK’s 5432 Department for Transport.

For more information on companies in this article

Related Content

  • IRF World Congress: moving ahead
    October 18, 2024
    On the last day of the three-day IRF World Congress in Istanbul, attendees heard what can work best, what can be improved and what the future might hold for those pursuing sustainable goals. David Arminas reports.
  • Tanzania toll roads development
    November 6, 2024
    Tanzania’s largest city to see toll roads development?
  • New emissions proposals - lean, clean green construction machines – but at what cost?
    October 3, 2014
    The European Commission has published proposals setting strict limits on exhaust emissions for off-highway machinery. This proposal has major implications for the construction machinery sector and would make the EU exhaust emissions limits the strictest in the world. There has been a call for swift reading of the regulation in Parliament and Council. This long-anticipated proposal for a revision of the directive 97/68/EC, covers exhaust emissions reduction for engines installed in non-road mobile machinery.
  • New study suggests Fehmarn Belt payback close to 50 years
    October 9, 2015
    A study by Danish consultant Hans Schjær-Jacobsen has shown that the payback period for the proposed Fehmarn Belt Fixed Link tunnel project between Denmark and Germany will be close to 50 years. This is a decade longer than estimated by the developers of the project which focusses on a 17km immersed tunnel, the study noted. The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The 17km tunnel, including two railway tunnels, two motorway tunnels and an