Skip to main content

Strasbourg bypass surveys halted over environmental concerns

Further delays are looming for construction of the western Strasbourg bypass, a controversial toll motorway project in north eastern France. The government is concerned about environmental issues after Arcos, the wholly-owned subsidiary of Vinci responsible for building the bypass, said it was going to carry out field surveys in 1.5 hectares of what many consider environmentally sensitive areas.
September 27, 2017 Read time: 2 mins
Further delays are looming for construction of the western Strasbourg bypass, a controversial toll motorway project in north eastern France.


The government is concerned about environmental issues after Arcos, the wholly-owned subsidiary of 5177 Vinci responsible for building the bypass, said it was going to carry out field surveys in 1.5 hectares of what many consider environmentally sensitive areas.

The project, which Arcos estimates at €553 million, is likely headed for a public inquiry towards the end of the year, according to media reports, with a construction start sometime in 2018.

In late 2015, French construction group Vinci’s consortium was named preferred bidder for the project. The win for Vinci came two years after winning the same contract, but which was cancelled over a lack of secure financing.

The 24km project is officially the tolled A355 Grand Contournement Ouest, a public-private partnership deal.

World Highways reported in March 2012 that the project was expected to cost up to €756 million, compared with the original estimate of €400 million quoted during the call to tender in 2009.

Construction was to have started in 2013 for opening by early 2017 at the latest.

For more information on companies in this article

Related Content

  • Construction to start on Hungary’s revamped M4 project in 2016
    July 7, 2015
    The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016. Hungarian media reported that the government will invest around €192 million and no funding will come from the European Union, of which the country is a member. The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media. The announcem
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • New designer for Houston Channel Bridge
    September 8, 2020
    Harris County in the US state of Texas recently fired FIGG from the $1 billion project.
  • Croatia: Peljeski Bridge decision in summer 2017
    November 21, 2016
    Croatia’s minister of infrastructure, Oleg Butkovic, said a winner will be chosen to build the controversial Peljeski Bridge on the Adriatic Sea coast by summer 2017. The project, valued at around €370 million, will be carried out in three phases. In June, a tender was started by the national roads company Hrvatske Ceste but was halted last month over complaints by some bidders about pre-qualification issues. The State Commission for Control of Public Ordering recently rejected the pre-qualificatio