Skip to main content

Singapore’s fast track project aided by new technology

New construction technology is helping speed construction for a new road connection in Singapore. The road will connect the Tampines Expressway (TPE) and the Kallang-Paya Lebar Expressway (KPE) with Punggol Central in Singapore. Virtual modelling has been used by the project team to design the new link and provide visualisations, as well as to tackle common issues such as clash detection, which can make major savings by eliminating the need for reworking. In addition, using precast concrete sections has hel
November 9, 2018 Read time: 1 min

New construction technology is helping speed construction for a new road connection in Singapore. The road will connect the Tampines Expressway (TPE) and the Kallang-Paya Lebar Expressway (KPE) with Punggol Central in Singapore. Virtual modelling has been used by the project team to design the new link and provide visualisations, as well as to tackle common issues such as clash detection, which can make major savings by eliminating the need for reworking. In addition, using precast concrete sections has helped reduce the time needed to erect components of the new road. The link would normally have taken up to three years to build but construction time has been cut by nine months. The work forms part of part of the KPE-TPE intersection expansion, costing nearly US$134 million.

Related Content

  • Going Digital helped the Government of Malaysia leverage digital twins to deliver trusted information for better project and asset management.
    March 30, 2020
    In 2014, the government of Malaysia announced a plan to fully develop and upgrade the two-lane trunk road across Malaysia’s largest state, Sarawak, to accelerate socioeconomic growth in East Malaysia.
  • High quality paving has been achieved at the Silverstone race track
    April 6, 2020
    Contractor Tarmac helped provide a high-quality surface for the UK’s famous Silverstone F1 racetrack, with the help of sophisticated technology from Topcon Positioning and Volz Consulting
  • In the fast lane at Indian F1 track
    June 21, 2012
    India’s new Formula 1 motor racing circuit, with its tight construction tolerances, demands considerable driving skill. More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group). Working with four Super 1800-
  • IRF Global Road Achievement Award Laureate
    January 5, 2016
    As a key engineering project on the Changsha-Chongqing Expressway in Southwest China, the Aizhai Bridge, constructed by the Hunan Road & Bridge Construction Group, was opened to traffic in March 2012. The Aizhai Bridge crosses the 1000m-wide scenic Dehang Canyon at an elevation of 355m. It has a main span of 1,176m, making it the world’s longest canyon-crossing bridge in the world. The erection of the main girder (the stiffening girder) of the Aizhai Bridge encountered serious challenges, including a la