Skip to main content

Parsons is handling a major interchange project in North Carolina

Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
June 21, 2017 Read time: 2 mins
RSS

3220 Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the 4027 North Carolina Department of Transportation (NCDOT).

It involves carrying out design services under a planning and design limited services contract for the I-26/US 74/NC 108 interchange improvement, located in Polk County, North Carolina. The project will provide ramp connections between westbound I-26 to eastbound US 74 and westbound US 74 to eastbound I 26. The work also involves the modernisation of NC 108 from west of Old Highway 19 to the intersection of Walker Road in Columbus.

Direct connections between the two major routes will lower congestion at the interchange, where interstate through-traffic is currently forced to exit the highway and travel through roundabouts on NC 108 before entering either US 74 or I-26.

Parsons and its team members will be responsible for all final designs, including National Environmental Policy Act documentation, as well as participation in public involvement activities.

The improvements to the I-26/US 74 ramps are scheduled to open prior to the Federal Equestre Internationale World Equestrian Games, which will be held in North Carolina in September 2018.

For more information on companies in this article

Related Content

  • Parsons selected for transport awards in California
    June 15, 2016
    The California Transportation Foundation (CTF) has selected two projects carried out by Parsons for the 27th Annual CTF Transportation Awards. These are the I-15 Integrated Corridor Management System (ICMS) for Operational Efficiency Program of the Year and the Foothill Gold Line extension for Transit/Rail Project of the Year. As the I 15 ICMS integrator, Parsons installed its cutting edge Intelligent NETworks product to help connect multimodal and multiagency transportation systems along a 32km section
  • $131 million St Louis road upgrade planned
    May 26, 2025
    A $131 million road upgrade is planned for St Louis.
  • Parsons wins 407 Transitway contract around the Toronto area in Canada
    August 21, 2015
    Parsons has been selected by the Canadian province of Ontario to provide environmental assessment planning and preliminary design for the next section of the 407 Transitway. Work will include 23km of bus rapid transit lanes, from west of Hurontario Street to east of Highway 400, as well as 11 transit stations, all around the provincial capital Toronto area. The project is part of the 150km cross-regional rapid transit corridor planned to parallel Highway 407 Express Toll Route freeway, a 107km control
  • Australian mega link route opens
    November 29, 2012
    Australia’s largest and most complex transport infrastructure project in the city of Brisbane has been officially opened to traffic. The first vehicles have now used the Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade projects, which together form an extensive US$5.85 billion transport project. The project in Australia’s third most populous city in the state of Queensland comprises a toll road and dedicated busway route, together involving almost 12km of tunnels (described