Skip to main content

Parsons is handling a major interchange project in North Carolina

Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
June 21, 2017 Read time: 2 mins
RSS

3220 Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the 4027 North Carolina Department of Transportation (NCDOT).

It involves carrying out design services under a planning and design limited services contract for the I-26/US 74/NC 108 interchange improvement, located in Polk County, North Carolina. The project will provide ramp connections between westbound I-26 to eastbound US 74 and westbound US 74 to eastbound I 26. The work also involves the modernisation of NC 108 from west of Old Highway 19 to the intersection of Walker Road in Columbus.

Direct connections between the two major routes will lower congestion at the interchange, where interstate through-traffic is currently forced to exit the highway and travel through roundabouts on NC 108 before entering either US 74 or I-26.

Parsons and its team members will be responsible for all final designs, including National Environmental Policy Act documentation, as well as participation in public involvement activities.

The improvements to the I-26/US 74 ramps are scheduled to open prior to the Federal Equestre Internationale World Equestrian Games, which will be held in North Carolina in September 2018.

For more information on companies in this article

Related Content

  • Gatso wins Netherlands section control enforcement contract
    April 26, 2012
    Gatso and the Traffic Enforcement Team of the National Public Prosecutor’s Office have signed a contract for a new section control system on one of the directions of the A2 highway in the Netherlands. According to Willebrord Freijsen, the team's director, director, the order was assigned to Gatso following a European tender procedure in which the company realised an excellent score.
  • Colorado construction contract commencing
    June 21, 2023
    Work is commencing on a key Colorado construction contract.
  • Virginia tunnel project seeing advance
    July 19, 2023
    Virginia’s massive tunnel project is seeing advance.
  • LiuGong loaders successful in Thailand
    October 3, 2014
    LiuGong claims to have retained its market leader position as Thailand’s top wheeled loader provider for the third consecutive year. The manufacturing juggernaut for extreme duty equipment entered the Thai market in 2011 and has sold 1,500 wheeled loaders in three years. President of LiuGong Machinery Asia Pacific Mr Chen Hao attributed the success to the brand’s consistent focus in understanding the wheeled loader industry’s needs and delivering products that are innovative, reliable and durable. L