Skip to main content

Parsons is handling a major interchange project in North Carolina

Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
June 21, 2017 Read time: 2 mins
RSS

3220 Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the 4027 North Carolina Department of Transportation (NCDOT).

It involves carrying out design services under a planning and design limited services contract for the I-26/US 74/NC 108 interchange improvement, located in Polk County, North Carolina. The project will provide ramp connections between westbound I-26 to eastbound US 74 and westbound US 74 to eastbound I 26. The work also involves the modernisation of NC 108 from west of Old Highway 19 to the intersection of Walker Road in Columbus.

Direct connections between the two major routes will lower congestion at the interchange, where interstate through-traffic is currently forced to exit the highway and travel through roundabouts on NC 108 before entering either US 74 or I-26.

Parsons and its team members will be responsible for all final designs, including National Environmental Policy Act documentation, as well as participation in public involvement activities.

The improvements to the I-26/US 74 ramps are scheduled to open prior to the Federal Equestre Internationale World Equestrian Games, which will be held in North Carolina in September 2018.

For more information on companies in this article

Related Content

  • Automatic control
    February 7, 2012
    Leica Geosystems says that sophisticated PowerDigger 2D guidance system for excavators offers automatic slope control. The system expands on its PowerSnap technology and is said to make excavating easier and more productive. The system uses a standard panel whether fitted to a dozer, excavator or grader, which is also said to save money on training and equipment, as well as reducing down time. Leica PowerDigger 2D system allows multiple elevations and slopes to be constructed at any orientation, witho
  • Temporary bridges for Michigan highway works
    September 21, 2023
    Temporary bridges will help with Michigan highway works.
  • Bolivia's Santa Cruz road corridor connector project
    December 22, 2016
    Bolivia’s ambitious Santa Cruz road corridor connector project is providing an important link for the country - Gordon Feller writes The World Bank has been organising a US$230 million loan to upgrade a vital connector linking the country’s northern and southern transit corridors. Meanwhile, another $100 million is coming from Bolivia’s government.
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load