Skip to main content

Norway planning E16 highway route

The Norwegian Government has unveiled its preferred solution for Hordaland road and railway route. This will be the so-called K5 alternative for the future E16 highway and Bergensbanen railway. The transport connections will run through the county of Hordaland in western Norway. This alternative will offer shorter distances, increased capacity and improved security. Journey time between Bergen and Voss will be reduced to 46 minutes from 72 minutes by car, and to 24 minutes from 63 minutes by train. The N
December 14, 2015 Read time: 1 min
The Norwegian Government has unveiled its preferred solution for Hordaland road and railway route. This will be the so-called K5 alternative for the future E16 highway and Bergensbanen railway. The transport connections will run through the county of Hordaland in western Norway. This alternative will offer shorter distances, increased capacity and improved security.

Journey time between Bergen and Voss will be reduced to 46 minutes from 72 minutes by car, and to 24 minutes from 63 minutes by train. The Norwegian Government is planning to give part of the project, between Arna and Stanghalle, priority for the National Transport Plan for 2018-2029.

Related Content

  • Norway drops tender plans for second Sotra fixed link
    February 18, 2019
    Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve
  • STRABAG wins Norway road and tunnel contract
    May 12, 2016
    STRABAG will build a section of the European Route E16 in Norway. This route connects capital Oslo with the Norway’s second largest city, Bergen and will be the first construction project being carried out in the country with STRABAG as sole contractor. The Øye–Eidsbru section is located about midway between Oslo and Bergen. The work comprises the new construction of 4.5km of main road and 2.1km of side roads. It includes a 1.97km long tunnel that will be built using conventional drilling and blasting me
  • Work starting on Norway’s mega-tunnel project
    January 5, 2018
    Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
  • Ireland’s €2 billion motorway linking Cork and Limerick
    July 5, 2024
    Ireland is planning €2 billion motorway linking Cork and Limerick