Skip to main content

Norway planning E16 highway route

The Norwegian Government has unveiled its preferred solution for Hordaland road and railway route. This will be the so-called K5 alternative for the future E16 highway and Bergensbanen railway. The transport connections will run through the county of Hordaland in western Norway. This alternative will offer shorter distances, increased capacity and improved security. Journey time between Bergen and Voss will be reduced to 46 minutes from 72 minutes by car, and to 24 minutes from 63 minutes by train. The N
December 14, 2015 Read time: 1 min
The Norwegian Government has unveiled its preferred solution for Hordaland road and railway route. This will be the so-called K5 alternative for the future E16 highway and Bergensbanen railway. The transport connections will run through the county of Hordaland in western Norway. This alternative will offer shorter distances, increased capacity and improved security.

Journey time between Bergen and Voss will be reduced to 46 minutes from 72 minutes by car, and to 24 minutes from 63 minutes by train. The Norwegian Government is planning to give part of the project, between Arna and Stanghalle, priority for the National Transport Plan for 2018-2029.

Related Content

  • Norway’s E10 project is officially underway
    August 7, 2023
    Hålogalandsvegen/Skanska will finance, build, maintain and operate a section of the E10 Hålogalandsvegen and Highway 85 Tjeldsund–Gullesfjordbotn–Langvassbukt north of the Arctic Circle.
  • Norway road and bridge works planned
    June 20, 2022
    Norwegian road and bridge works are being planned.
  • Frost-heave a problem on Norwegian roads
    May 8, 2012
    Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2