Skip to main content

Mott MacDonald to design highway improvements in Czech Republic

Mott MacDonald has been appointed by the Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways. R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country. Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.
August 6, 2015 Read time: 2 mins
2579 Mott MacDonald has been appointed by the 2873 Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways.

R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country.

Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.

The consultancy will also design 5.3km of road for the R55 expressway, which links the city of Olomouc to the town of Breclav. Works include seven bridges, two overpasses, a railway bridge, 15 retaining walls and six noise barriers, as well as the relocation of a bus stop.

“Our duties will include preparing the planning permit documentation for everything from preliminary designs for highways, bridges, retaining walls and drainage, to noise and dispersion studies and environment impact assessments,” said Jan Semerad, Mott MacDonald’s project director.

Design work will be finished by the end of the first quarter of 2016.

“These projects continue our substantial involvement in modernising the Czech Republic’s motorway network, as Mott MacDonald is also leading a joint venture that was recently appointed to modernise section 10 of the D1 motorway,” he said.

Mott MacDonald, an employee-owned company, in based near London, UK and has 16,000 employees globally. Turnover is around US$2 billion, coming projects in many sectora apart from transport infrastructure -- buildings, communications, mining, oil and gas, power, water and wastewater, as well as urban development.

The company recently completed an urban mobility study for the Kenyan capital city Nairobi, looking at transport options to support the city’s economic development under its Vision 2030 plan.

For more information on companies in this article

Related Content

  • Qatar starts work on the state’s longest cable stayed bridge
    April 23, 2019
    Qatar has started construction of a 1.2km cable-stayed bridge that will be the longest in the Gulf state. The bridge will have 20 pylons and 16 piers to reach the highest point of 30m. It is part of the Sabah Al-Ahmad Corridor project, according to the Public Works Authority of Qatar (Ashgal). With four lanes in each direction, the bridge will accommodate more than 16,000 vehicles a hour, according to Ashghal engineer Abdullah al-Naiemi. Comnpletion is set for early 2021. Meahwhile, the Haloul Int
  • Riga's newest bridge improved traffic flow
    April 11, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List.
  • Riga's newest bridge improved traffic flow
    May 9, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List. The city of some 750,000 people (the country's total population is 2.2 million) is bounded to the south by Lithuania and to the north by Estonia, and is the second largest in Baltic States. To the east is Russia and Belarus.
  • Parsons wins 407 Transitway contract around the Toronto area in Canada
    August 21, 2015
    Parsons has been selected by the Canadian province of Ontario to provide environmental assessment planning and preliminary design for the next section of the 407 Transitway. Work will include 23km of bus rapid transit lanes, from west of Hurontario Street to east of Highway 400, as well as 11 transit stations, all around the provincial capital Toronto area. The project is part of the 150km cross-regional rapid transit corridor planned to parallel Highway 407 Express Toll Route freeway, a 107km control